background image

    17

Содержание B-10U-FFB

Страница 1: ...1 Installation Instructions for Electric Boilers USA JULY 2006 VERSION 9 THERMOLEC...

Страница 2: ...1...

Страница 3: ...Report any damage or claims to the carrier immediately 2 3 For all returns to be accepted they must be authorized by the manufacturer 3 Location and dimensions 3 1 These boilers are designed for wall...

Страница 4: ...nting holes Electronic temperature sensor 18 18 Temperature pressure gauge Incoloy elements High limit thermal cut out Solid state relays Mono or Dual energy controller Pump relay Ground lug Fuse and...

Страница 5: ...e z i S r e k a e r B Dual Energy Models B 18U FFB B 24U FFB B 30U FFB B 35U FFB B 40U FFB Mono Energy Models B 18U M B 24U M B 30U M B 35U M B 40U M kW 18 24 30 35 40 BTU H 61 416 81 888 102 360 119...

Страница 6: ...t be installed at the supply outlet of the unit This T must be equipped with a reducing bushing 1 1 4 to 3 4 NPT facing upwards to accept a 3 4 NPT pressure relief valve This safety valve must be inst...

Страница 7: ...ty for the intended application The pump should be placed as close as possible to the boiler Ensure that the water direction is correct An arrow indicating the circulation direction is generally visib...

Страница 8: ...ther source of heat is selected Follow the extra steps dedicated to a FFB installation in the start up sequence 8 10 Set the room thermostat heat anticipator when available to 0 2 Amperes 8 11 If the...

Страница 9: ...control terminals of the electronic board to the thermostat terminals of the existing boiler 9 17 Terminals S1 S2 on the electronic board should receive the utility Load Management Control wires 9 18...

Страница 10: ...the selected heat source by means of a motorized valve 12 Position and electric values of heating elements Standard values of heating elements at 240 Volts are 3kW 5kW 5 75kW 8 75kW et 10 kW Please r...

Страница 11: ...e authorized by Thermolec carried out without its written consent voids this warranty Thermolec s responsibility shall be limited in any case to the replacement or repair in its factory or in the fiel...

Страница 12: ...060 240 27 00 8750 6 6 CBLR058 8750 6 6 CBLR058 5000 11 5 CBLR055 5000 11 5 CBLR055 30 00 8750 6 6 CBLR058 8750 6 6 CBLR058 8750 6 6 CBLR058 3000 19 2 CBLR065 35 00 8750 6 6 CBLR058 8750 6 6 CBLR058 8...

Страница 13: ...14 4 CBLR051 24 00 6 4000 10 8 CBLR052 30 00 6 5000 8 7 CBLR053 36 00 6 5750 7 5 CBLR054 13 Cyl 18 00 3 6000 12 8 CBLR056 24 00 3 8000 9 6 CBLR061 30 00 3 10000 7 7 CBLR062 35 00 3 11600 6 6 CBLR063 4...

Страница 14: ...13...

Страница 15: ...___________________ Installer Name _________________________________________ Telephone ________________ Date Installed _____________________ Comments Suggestions ______________________________________...

Страница 16: ...15...

Страница 17: ...EDUCING VALVE TEMPERATURE PRESSURE GAUGE RETURN EXPANSION TANK CIRCULATING PUMP MAINTENANCE VALVE AUTOMATIC AIR VENT LOAD MANAGEMENT CONTROL POWER SUPPLY 120V 1 PUMP POWER SUPPLY MAINTENANCE VALVE MAI...

Страница 18: ...17...

Страница 19: ...ANSION TANK MAINTENANCE VALVE DUAL ENERGY CONTROLLER SAFETY VALVE POWER SUPPLY ROOM THERMOSTAT MAINTENANCE VALVE MAINTENANCE VALVE MAINTENANCE VALVE BURNER DRAIN OR PURGE VALVE PRESSURE REDUCING VALVE...

Страница 20: ...19...

Страница 21: ...AL ENERGY CONTROLLER SAFETY VALVE ROOM THERMOSTAT MAINTENANCE VALVE MAINTENANCE VALVE MAINTENANCE VALVE MAINTENANCE VALVE BURNER DRAIN OR PURGE VALVE OIL GAS BOILER DUAL ENERGY PARALLEL INSTALLATION I...

Отзывы: