background image

 

6  

R

A

D

I

A

N

T

 

O

U

T

D

O

O

R

 

H

E

A T

E

R

S

 

INSTALLATION  
INSTRUCTIONS

 

 
Ensure all minimum clearance requirements are met and the materi-
als used are compliant to your local building codes.  
 
Before installing the FME, ensure the site to be fixed is fully pre-
pared with the hole cut the correct size and the mounting points se-
curely in place. 
 
 

STEP 1: Attach the 
brackets to the rear of 
the heater. The dimen-
sions for the spacing of 
the brackets is listed in 
the table. 
 
 
 
STEP 2: Screw the 
FME into the battens. 
NOTE: screws are not 
included. 
 
 
 
 
 
 
 
STEP 3: If there is no 
roof access, connect the 
heater to the power 
source, ensure the 
power is OFF. 
 
 
 
 
 
 
STEP 4: Lift the heater 
into the FME ensuring 
the brackets are to the 
side of the mounts 
 
 
 
 
STEP 5: Push the 
heater to the left ensur-
ing the brackets engage 
in the mounts. It will 
then drop in. Shake the 
heater to ensure that it 
is securely mounted. 

MODEL 

“D” 

DISTANCE FROM END 

TO BRACKET (mm) 

THH1500A 

150 

THH1800A 

240 

THH2400A 

370 

THH3200A 

425 

HEATER

BRACKET x2

FLUSH MOUNT ENCLOSURE

TIMBER BATTEN

PLASTER CEILING

SCREWS, AT EACH END, THERE ARE 6 HOLES
WITH A DIAMETER OF 8mm EACH

ON

OFF

"D"

"D"

Содержание THH1500A

Страница 1: ...R A D I A N T O U T D O O R H E A T E R S OPERATION INSTALLATION AND MAINTENANCE MANUAL Flush Mount Enclosure The heater that is a design feature...

Страница 2: ...on a wall fitted flush with the ceiling suspended on chains or poles attached to beams or poles mounted end to end or 2 units together Refer to the following pages for more detailed information on eac...

Страница 3: ...vironment Maximum mounting heights should be strictly followed otherwise the performance of the units may be reduced The facia of the enclosure is manufactured from 316 Stainless Steel and the rear ca...

Страница 4: ...IMENSIONS VIEW FROM UNDERNEATH VIEW FROM TOP MODEL A mm B mm C mm THH1500A 1030 974 970 THH1800A 1210 1154 1150 THH2400A 1470 1414 1410 THH3200A 1880 1824 1820 PART No THHAC 009 THHAC 010 THHAC 011 TH...

Страница 5: ...CLOSURE ROOFING MATERIAL VIEW FROM SIDE INSTALLATION CLEARANCE DIMENSIONS Shown in the diagrams below are the minimum clearance required for the installation of the Flush Mount En closure It is impera...

Страница 6: ...he table STEP 2 Screw the FME into the battens NOTE screws are not included STEP 3 If there is no roof access connect the heater to the power source ensure the power is OFF STEP 4 Lift the heater into...

Страница 7: ...closure is made from durable materials however regular care and maintenance of your product will help prolong its life It is recommended that you wipe down your Flush Mount Enclosure and with a soft c...

Страница 8: ...dvance of an examination of the faulty product or components by Thermofilm or an authorized representative of Thermofilm Thermofilm does not participate in any site related costs or labour expenses in...

Отзывы: