![Thermo Solar ECO2 160 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/thermo-solar/eco2-160/eco2-160_technical-installation-manual_1105432012.webp)
12
We first position the water tank
on the top of the support base
of the solar system and then we
install the collector(s) being
careful that the index arrow of
the sticker on the side of each
collector points downwards,
and when we finish we use
properly the plump level in
order to check that our
collector(s) is/are aligned.
Afterwards we position the
metallic corner supports of
collector(s) (
H
) as at (
photo 1
)
that we have to insert them first
in the aluminium frame of the
collector and then screw them
in the jam nut M8 that is placed
to the horizontal support angle.
We place one edge of the
transparent special plastic tube
(
L
) at the refilling valve that is
photo 1
H
N
J
K
photo 2
photo 3
INSTRUCTIONS FOR THE MOUNTING OF THE
μ
∞
08