11
Upgrade Equipment
Upgrading a Stand Alone TRACE 1300/TRACE 1310 to MS Version
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
557
Coupling with the ISQ Series / TSQ 8000 Series Mass Spectrometer
To update the GC for the coupling with the ISQ Series /TSQ 8000 Series mass
spectrometer
1. Make sure that the preliminary operations have been carried out. See
2. Remove the left side panel.
a.
Open the front door of the GC.
b. Use a T20 Torxhead screwdriver to screw the left side panel screw from the interior
front panel. See
. Save the screw because it will be reused later.
Figure 608.
Left Side Panel Fixing Screw
c.
Slide the panel towards the back of the instrument up to the stop.
d. Remove the panel pulling it outward being aware that the ground wire is attached to
the panel. See
e.
Unplug the ground wire from the panel.
CAUTION - INSTRUMENT DAMAGE:
Condition the column before connecting it to the
transfer line. The material released from the column (column bleed) during conditioning
may contaminate the detector.
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......