4
Switching Probes
Switching From APCI to ESI
54
Surveyor MSQ Plus Hardware Manual
Thermo Scientific
8. Turn the locking plate on the ESI probe clockwise to the open position. Insert the ESI
probe into the probe heater as shown in
. Then, turn the locking plate
counterclockwise to the closed position.
9. Insert the PEEK fingertight fitting into the ESI probe and screw in.
See
, which shows the Surveyor MSQ Plus MS detector setup for the ESI mode.
10. Adjust the nitrogen gas pressure to 520 kPa (75 psi).
Figure 34.
Surveyor MSQ Plus MS detector setup for the ESI mode
ESI probe
Corona pin knob
Source housing
Probe mount
Probe heater