11
I
NSTALLATION
• Pour sealing compound down in between the two fiber rope dams filling the remaining space. Pour slowly,
being careful not to trap air bubbles. Immediately wipe off any spilled sealing compound.
• Screw conduit domed-cover back onto conduit opening.
NOTE: INITIAL SETUP OF SEALING COMPOUND WILL OCCUR IN APPROXIMATELY 30 MINUTES HOW-
EVER, THE SEALING COMPOUND REQUIRES A
MINIMUM OF 8 HOURS ABOVE 32ºF
TO DEVELOP
SUFFICIENT STRENGTH TO WITHSTAND EXPLOSIONS.
Explosion-Proof Installation Continued: