CE-EMC Protection Installation Procedure
Procedure
E-2
LevelPRO Installation Guide
Thermo Fisher Scientific
The EMC protection board wires are run through the connection fittings
at the factory so that the cable gland between the EMC board housing and
the detector housing could be factory sealed. There are 14 wires in total:
two for DC power and 12 for input/output or communication wiring.
Figure E–1.
EMC protection board assembly
Figure E–2.
Bracket assembly
Содержание LevelPRO Series
Страница 2: ......
Страница 3: ...LevelPRO Continuous Gamma Level System Installation Guide P N 717760 Revision H ...
Страница 4: ......
Страница 6: ...This page intentionally left blank ...
Страница 8: ...This page intentionally left blank ...
Страница 14: ...This page intentionally left blank ...
Страница 28: ...This page intentionally left blank ...
Страница 40: ...This page intentionally left blank ...
Страница 48: ...This page intentionally left blank ...
Страница 90: ...Drawings C 42 LevelPRO Installation Guide Thermo Fisher Scientific Figure C 39 868709 HART retrofit LevelPRO ...
Страница 96: ...This page intentionally left blank ...
Страница 106: ...This page intentionally left blank ...
Страница 110: ...This page intentionally left blank ...