7
INSTALLATION
√
SHIPPING CARTON:
This should be inspected upon delivery. When received, carefully
examine for any shipping damage before unpacking. If damage is discovered,
the delivering carrier should both specify and sign for the damage on your copy
of the delivery receipt.
Open the carton carefully making certain that all parts are accounted for
before packaging materials are discarded—after unpacking, if damage is found,
promptly report it to the carrier and request a damage inspection promptly.
IMPORTANT: Failure to request an inspection of damage within a few
days after receipt of shipment absolves the carrier from any liability for damage:
you must call for a damage inspection promptly.
LOCATION:
Place the unit on a level table or bench where it will be operated, away
from drafts and wide variations in ambient temperature, near a power supply
source that matches the unit nameplate requirements. Allow clearance around
the unit for free air convection, accessory attachment and user convenience.
The incubator door opens from the left side.
THERMOMETER INSTALLATION:
The thermometer holder doubles as a vent fixture on the top of the unit.
Place the grommet in the hole at the top of the thermometer holder. Push the
thermometer, supplied with the unit, through the grommet until 3-inches of the
thermometer (including the bulb) extends through the holder. Push the holder
into the vent on top of the cabinet until about 1/4-inch of the holder is exposed.
NOTE:
IT MAY BE NECESSARY TO SQUEEZE THE 3 PRONGS OF THE
THERMOMETER HOLDER TO INSTALL IT MORE EASILY.
The thermometer bulb should extend about 2-inches into the chamber.
Turn the thermometer in its holder for easy reading.
THERMOMETER
THERMOMETER HOLDER GROMMET
THERMOMETER HOLDER
THERMOMETER VENT
(TOP OF INCUBATOR)
INSTALLATION:
(Con’t)
SHELF INSTALLATION:
100 series comes with 1 fixed shelf. 120 series units are supplied with
two aluminum shelves: one is fixed to the bottom of the chamber, the other is