5
Installation
Page 98
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
5.5.5
Installing the Source Housing Drain Insert and Sweep cone
Your instrument ships with the source housing drain insert and sweep cone
uninstalled due to risk of shipping damage to sensitive parts. Please follow
this step-by-step guide prior to turning on the power.
WARNING—Instrument Damage
Wear gloves and eye protection to avoid contamination of sensitive
parts.
AVERTISSEMENT—Risque d’endommagement de l’instrument
Portez des gants et des lunettes de protection pour éviter de contaminer
les parties sensibles.
1)
Open the front bezel by grasping the door on the left edge.
2)
Lift up the top hatch of the instrument to provide sufficient space to
remove the source housing as shown in Figure 43.
Figure 43: Removal of the source housing
3)
Remove PEEK capillary fitting connection at grounding union as
shown in Figure 44.
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...