6
Operation
Page 162
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
6.7.3
Venting the Mass Spectrometer
Follow the procedure below to vent the mass spectrometer.
1)
Disconnect the data system from the instrument in Chromeleon
software.
2)
Push the power button at the back of the instrument down to the off
position to power off the mass spectrometer. See Figure 89.
Figure 89: Powering off the mass spectrometer
3)
Wait 5 minutes.
4)
Loosen the vent valve knob inside the front door of the instrument next
to the source housing. See Figure 90.
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...