![Thermo Scientific iCAP RQ ICP-MS Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/thermo-scientific/icap-rq-icp-ms/icap-rq-icp-ms_pre-installation-requirements-manual_1105076047.webp)
Consumables
Gas Supply
5-6
iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
Thermo Scientific
shows the torque plate with the gas connections for the iCAP
RQ ICP-MS 2-channel systems.
NOTICE
Depending on the number of additional gas modules installed,
the gas connection plate may look different.
▲
lists the connector types for the gases.
Labeled Components: 1=additional gas 1 inlet, 2=additional gas 2 inlet,
3=argon gas inlet, 4=CCT2 inlet, 5=CCT1 inlet
Figure 5-4.
Gas connection at the left of iCAP RQ 2-channel system
Table 5-3.
Gas connections at iCAP RQ ICP-MS
Label
Connection
Tubing/ Capillary
Argon
push-in fitting
6 mm OD
CCT 1
bulk head union
1/16" OD
CCT 2
bulk head union
1/16" OD
Add1
push-in fitting
6 mm OD
Add2
push-in fitting
6 mm OD
1
2
3
4
5
Содержание iCAP RQ ICP-MS
Страница 1: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 2: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 69: ...I 4 iCAP RQ Pre Installation Requirements Guide P N BRE0009927 Revision A Thermo Scientific Index W W ...
Страница 71: ......