iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
4-1
Chapter 4
Line Power
The performance and longevity of your system can be affected by the
quality of line power delivered to the system. To ensure that your
instrument performs optimally and is not damaged by line power
fluctuations, verify that you comply with all power quality requirements
listed in this manual.
NOTICE
It is your responsibility as the operator to provide a source of
power of acceptable quality for the operation of your system.
▲