Dionex Integral Systems Operator’s Manual
64
Doc. 065250-06 03/2020
4.4
SS Power and Computer Connections
Receptacles for connecting a power cord and USB cable are on the side of the SS
(see
Fuse Holder and Power Receptacle
The fuse cartridge contains two fast-blow IEC 127 fuses rated 3.15 A
(P/N 954745). For instructions on how to change the fuses, see
The power cord plugs into the IEC 320 three-prong receptacle. Connect the power
cord from this connector to a grounded power source.
•
If the SS is mounted on an AE or installed inside an AE, connect the power
cord to the power outlet strip inside the AE (see
). The AE power
outlet strip is a grounded receptacle.
•
When the SS is mounted on the side of the AE or installed inside the AE, the
AE power cord is the main disconnect device. In addition, the AE main power
switch (see
Emergency Off
used to control the power to the SS.
Figure 4-3. SS USB and Power Receptacles
SHOCK HAZARD—If a grounded receptacle is not used, a shock
hazard may result. Do not operate or connect to AC power mains
without earthed ground connections.
The power supply cord is used as the main disconnect device. Make
sure the socket-outlet is located near the module and is easily
accessible.
Fuse Holder
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...