E • Peristaltic Pump Kit Installation Instructions
Doc. 065250-06 03/2020
189
the peristaltic tubing adapter set. Install the nut and ferrule on the
tubing as shown in
.
13. If you removed the SP from the AE rear panel during this installation
procedure:
a.
Lift up the SP, align the four hooks on the rear of the SP with the
mounting rails on the AE rear panel, and hang the SP on the rails.
b. Replace any modules that were removed from the lower shelf of
the AE.
c.
Replace the two access panels on the exterior of the AE.
14. Plug in the power cord and turn on the power.
E.2.4
Configuring the Pump in Chromeleon 7
1. Start the Chromeleon 7 Instrument Configuration Manager.
2. Double-click the SP icon under the instrument name. The
Properties
dialog box appears.
3. Click the
Solenoids
tab.
4. Select
SV9
(when configuring the first or only pump) or
SV10
(when
configuring the second pump) and press
F2
.
5. In the
Device Configuration
dialog box, under
Mode
, select
DeviceControl
and click
OK
. The solenoid valve 9 (or 10) connector
on the main SP electronics board is now assigned to control the
peristaltic pump rather than a solenoid valve.
6. Save the configuration.
Figure E-9. Fitting Nut and Ferrule for Peristaltic Tubing Connections
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...