C • TTL and Relay Installation Instructions
Doc. 065250-06 03/2020
171
Connect the Cable
1. Connect the extension cable to the tower light cable.
2. Route the extension cable to the inside of the SP enclosure.
3. If you have not done so already, access the main SP electronics board
4. Plug the other end of the extension cable into the relay connector on
the TTL/Relay controller board on the SP service door (see
5. Close and secure the SP service door.
6. If you previously removed the SP from the AE rear panel:
a.
Lift up the SP, align the four hooks on the rear of the SP with the
mounting rails on the AE rear panel, and hang the SP on the rails.
Figure C-18. TTL/Relay Controller Board on SP Service Door
(Horizontal SP Enclosure Shown)
Relay Connector
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...