C • TTL and Relay Installation Instructions
Doc. 065250-06 03/2020
169
C.4
Installing the AE Tower Light Kit
NOTE Before starting this procedure, install the SP TTL and
Relay Kit (see
C.4.1
Overview
The AE Tower Light Kit (P/N 068549) provides parts for mounting a
tower with four LED lights onto the top of the AE enclosure. The kit
includes the following parts:
Additional item needed
:
Phillips screwdriver
C.4.2
AE Tower Light Kit Installation Procedure
These are the main steps in the installation procedure:
•
Mounting the tower light onto the AE
•
Connecting the cable
Mount the Tower Light onto the AE
1. Unscrew the ring from the bottom of the tower light and slide the ring
off the tower light cable.
Part Number
Item
Quantity
069062
Light, tower, LED, 24 Vdc, red,
yellow, green, blue
1
069198
Cable, extension, tower light
1
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...