Dionex ICS-5000
+
Installation Instructions
78
Doc. 065447-02 12/14
4.1.8
Completing the Operational Qualification
If you purchased the Operational Qualification (OQ) option, complete the
procedure now for a CD system.
For an ED system, complete the OQ after filling and flushing the liquid path,
setting up the EG, and performing the system function test.
4.1.9
Filling and Flushing the ED Liquid Path
1. Locate the cell inlet line and fittings in the ED Cell Inlet Tubing Kit
(P/N 074221) shipped with the cell. The cell inlet line is a 23 cm (9.00 in)
length of blue capillary tubing (P/N 082618).
2. Connect the cell inlet line as shown in
. Use the long 10-32
fitting bolt (P/N AAA-057227) and split-cone ferrule (P/N 062978) for
the cell
IN
connection.
Capillary
IC
Before beginning the fluidic connections, install the working electrode
and the reference electrode in the cell. For instructions, see
“Installing the ED Amperometry Cell” on page 127
Capillary
IC
Figure 4-4. Flow Schematic for Filling and Flushing the ED Liquid Path
5
6
3
CRD
CES
2
SAMPLE OUT
REGEN IN
ELUENT OUT
ELUENT IN
SAMPLE IN
ELUENT OUT
ELUENT IN
ELUENT OUT
ELUENT IN
ELUENT OUT
ELUENT IN
EG
DEGAS
ELUENT IN
ELUENT OUT
VENT
5000 psi
CRD
BYPASS
SUPPRESSOR
BYPASS
REGEN IN
OUT
IN
EG DEGAS IN
EG DEGAS OUT
To waste
From pump
ED Cell Inlet Tubing
(P/N 082618
Fill and flush liquid path (ED):
Pump purge mode at 0.1 mL/min for 30 min
Through tubing
chase to rear
panel