2 • Features
Doc. 031857-03 4/06
2-7
EGC Service Area
The EGC service area holds the cartridge during installation and
replacement. See
for instructions.
2.1.3
Component Panel
shows the user-accessible components installed on the
component panel behind the ICS-2000 front door.
Figure 2-8. ICS-2000 Component Panel
Mounting Brackets for
a Second Suppressor
DS6 Cell
Injection Valve
Pump Heads
Suppressor
Pressure Transducer
Column Heater
and Columns
Eluent Valve
1
Leak Sensor
Screen Adjustment
Knob (under display)
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
8
11
11
10
Tubing Chase (2)
11
9
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...