Priming the Pump
Doc. 031857-03 4/06
B-31
B.13 Priming the Pump
1. Verify that the eluent reservoir is filled, the reservoir cap is installed and
handtightened, and the liquid line from the ICS-2000 to the reservoir cap is
connected (see
2. Verify that the waste lines are directed to a waste container.
3. The priming procedure consists of two parts:
•
Priming the eluent lines with a syringe (see
procedure at initial installation, after changing eluents, or when eluent
lines are empty.
•
Priming the pump heads with the
Prime
Perform this procedure after the eluent lines are primed.
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...