Doc. 031857-03 4/06
B-1
B • Installation
This chapter provides instructions for the initial installation of the ICS-2000 Ion
Chromatography System.
NOTE These installation instructions are also shipped with the
ICS-2000 as a stand-alone printed manual (Document
No. 031858).
NOTE The order of the steps is important. It is especially
important to install Chromeleon before connecting the
USB cable and turning on the ICS-2000 power.
B.1
Facility Requirements
•
Make sure the ICS-2000 installation site meets the power and environmental
specifications listed in Appendix A.
•
Provide a sturdy workbench for the ICS-2000 of a height that ensures
convenient access to the interior of the ICS-2000.
•
Allow at least 15 cm (6 in) behind the ICS-2000 for power connections and
ventilation. For optimal performance, install the ICS-2000 in a draft-free
location, out of the path of air conditioning and heating vents.
•
(Optional) Provide a clean gas source regulated to between 0.55 and
0.83 MPa (80 and 120 psi) for pressurization of the eluent reservoir.
•
Use ASTM filtered, Type I (18-megohm) deionized water when preparing
eluent and regenerant.
Содержание Dionex ICS-2000
Страница 1: ...ICS 2000 ION CHROMATOGRAPHY SYSTEM OPERATOR S MANUAL Document No 031857 Revision 03 April 2006...
Страница 64: ...ICS 2000 Ion Chromatography System 2 44 Doc 031857 03 4 06...
Страница 204: ...ICS 2000 Ion Chromatography System A 6 Doc 031857 03 4 06...
Страница 366: ...ICS 2000 Ion Chromatography System D 12 Doc 031857 03 4 06...
Страница 372: ...ICS 2000 Ion Chromatography System F 4 Doc 031857 03 4 06...
Страница 378: ...ICS 2000 Ion Chromatography System G 6 Doc 031857 03 4 06...