![Thermo Scientific Alpha CON 550 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/thermo-scientific/alpha-con-550/alpha-con-550_manual_1105315015.webp)
Instruction Manual
Alpha-
CON 550
9
2.4.3 Panel Mount
Panel
Gasket
Prepare panel cut-out of
92.0 mm X 92.0 mm
Remove back cover of
conductivity monitor
and slide it through
panel cut-out
Attach catch to both sides
of conductivity monitor
Insert threaded rods through catch
until conductivity monitor is held
against panel
2
3
4
1
1
Panel
Содержание Alpha CON 550
Страница 1: ...Alpha CON 550 Conductivity Monitor mS S C F meter...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 38: ...NOTES...
Страница 39: ......