Installation and Setup
Mounting Options
2-4
43iQ Instruction Manual
Thermo Scientific
Mounting in a rack includes removing the front panel and installing ears
and handles.
Equipment required:
Phillips drive, #2
1.
Start by gripping from the top corners of the front panel and pull
outwards.
Figure 2–3.
Removing the Front Panel
2.
Unfasten the four 8-32 pan head screws.
3.
Slide ears outwards.
4.
Use the same four 8-32 pan head screws to secure it.
5.
Install the handles with the four 8-32 flat head screws that came with
the handle kit on the backside as shown.
Rack Mount
Содержание 43iQ
Страница 1: ...43iQ Instruction Manual Sulfur Dioxide Analyzer 117568 00 1Sep2021 ...
Страница 2: ......
Страница 8: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 43iQ Instruction Manual Thermo Scientific ...
Страница 162: ......
Страница 166: ...Maintenance Pump Rebuilding 5 4 43iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 170: ......
Страница 180: ......
Страница 188: ...Servicing Fan Replacement 7 8 43iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 228: ......
Страница 238: ......
Страница 262: ......
Страница 270: ......
Страница 282: ......
Страница 283: ......