High Performance Incubator 4-1
Thermo Scientific
Section 4
Unpacking and Installation
The shipping carton should be inspected upon delivery. When received,
carefully examine for any shipping damage before unpacking. If damage is
discovered, the delivering carrier should both specify and sign for the
damage on your copy of the delivery receipt.
Open the carton carefully, making certain that all parts are accounted for
before packaging materials are discarded. After unpacking, if damage is
found promptly report it to the carrier and request a damage inspection
promptly.
Important
Failure to request an inspection of damage within a few days
after receipt of shipment absolves the carrier from any liability for damage.
Call for a damage inspection promptly.
Note
Disconnect the unit from the power source when not in use.
s
Place the unit on a level surface protected from drafts, strong air currents
and large fluctuations in ambient temperature. It must be located near an
electrical outlet that meets the unit nameplate requirements. Allow
clearance around the unit for free air convection, accessory equipment, and
user convenience. Do not cover the vent on top of the incubator.
It is important that the unit is level before operation. DO NOT
REMOVE THE UNIT’S RUBBER FEET—they assist proper air
circulation inside and outside of the chamber. Removal can result in erratic
control and excessive heat build-up beneath the unit.
1. Each shelf bracket has 2 prongs at each end for attachment to the
chamber sidewall. Insert the longer top prongs into slots of equal
height on one side of the chamber, then push the bracket up and insert
the lower prongs.
2. Push down on the bracket to ensure proper seating.
3. Repeat this procedure for the opposing bracket making sure it is on the
same level as the first bracket (count the slots).
4. Install remaining shelf brackets, then slide shelves into place.
Location
Leveling
Shelf Installation