Operating Instructions (Rev. 12/03)
26
7.
SETPOINT/MODE KEY BUZZER. This buzzer
sounds when the setpoint is changed until the Enter
Key is pressed. It also sounds when a Mode Key selec-
tion is changed until the Enter Key is pressed.
8.
OVERLOAD RELAY—Manual Reset (Model 50). An
overload relay protects the standby electric motor. The
overload relay opens the circuit to the electric motor if
the motor overloads for any reason (e.g., low line volt-
age or improper power supply) while the unit is on
electric standby operation.
UNIT OPERATION
Manual Pretrip Inspection (Before Starting
Unit)
The following Manual Pretrip Inspection should be com-
pleted before starting the unit and loading the trailer. While
the Manual Pretrip Inspection is not a substitute for regu-
larly scheduled maintenance inspections, it is an important
part of the preventive maintenance program designed to
head off operating problems and breakdowns before they
happen.
1.
FUEL. The diesel fuel supply must be adequate to
guarantee engine operation to the next check point.
2.
ENGINE OIL. The engine oil level should be at the
FULL mark with the dipstick turned (threaded) into oil
pan. Never overfill.
3.
COOLANT. The engine coolant must have antifreeze
protection to -30 F (-34 C). Code 37 indicates low cool-
ant. Add coolant in the expansion tank.
CAUTION: Do not remove expansion tank cap
while coolant is hot.
4.
BATTERY. The terminals must be clean and tight.
5.
BELTS. The belts must be in good condition and
adjusted to the proper tensions.
6.
ELECTRICAL. The electrical connections should be
securely fastened. The wires and terminals should be
free of corrosion, cracks or moisture.
7.
STRUCTURAL. Visually inspect the unit for leaks,
loose or broken parts and other damage. The condenser
and evaporator coils should be clean and free of debris.
Check the defrost drain hoses and fittings to make sure
they are open. Make sure all the doors are latched
securely.
Starting Unit With Electronic Full Pretrip
This procedure is used for a complete checkout of the unit
and unit control circuits. It should be used when first start-
ing the unit for a trip before the cargo is loaded. A full Pre-
trip procedure may take up to 30 minutes and the unit will
run unattended.
1.
Perform a Manual Pretrip Inspection.
2.
Place the On/Off switch in the ON position. Adjust the
setpoint to the desired load temperature (refer to the
appropriate Operator’s Manual or Operation and Diag-
nosis Manual for detailed information about adjusting
the setpoint).
a.
Change the setpoint display with the arrow keys.
b.
Enter the new setpoint by pressing the ENTER key
within 5 seconds.
3.
Initiate a Pretrip test (refer to the appropriate Opera-
tor’s Manual or Operation and Diagnosis Manual for
detailed information about the Pretrip). This procedure
is automatic and can be performed on the way to the
loading area or while waiting to load.
a.
Clear any alarms.
b.
Press the PRETRIP key.
•
PRE TRIP will appear on the display.
Содержание SB-190 30
Страница 4: ......
Страница 8: ......
Страница 14: ...4...
Страница 26: ...Unit Description Rev 12 03 16 Front View AJA890...
Страница 27: ...Unit Description Rev 12 03 17 1 Defrost Damper 2 X430L Compressor 3 se 2 2 Engine Back View 1 2 3 AJA894...
Страница 30: ...Unit Description Rev 12 03 20 ARA158 1 DAS Optional 2 Relay Board 3 Microprocessor Control Box Components 1 2 3...
Страница 40: ...Operating Instructions Rev 12 03 30...
Страница 74: ...64...
Страница 92: ...82...
Страница 100: ...90...
Страница 113: ...103 SB 100 190 Schematic Diagram Page 1 of 2...
Страница 114: ...104 SB 100 190 Schematic Diagram Page 2 of 2...
Страница 115: ...105 SB 100 190 Wiring Diagram Page 1 of 5...
Страница 116: ...106 SB 100 190 Wiring Diagram Page 2 of 5...
Страница 117: ...107 SB 100 190 Wiring Diagram Page 3 of 5...
Страница 118: ...108 SB 100 190 Wiring Diagram Page 4 of 5...
Страница 119: ...109 SB 100 190 Wiring Diagram Page 5 of 5...