Refrigeration Maintenance
94
5. Operate the unit on cool, and pump down the
low side to 0 in. (0 kPa) of vacuum.
6. Stop the unit. The condenser and suction
pressures should remain stable, indicating no
leaks.
7. Shift the three-way valve to heat position
using relay board test. Low side gauge will
raise slightly. High side gauge will drop to
approximately 30 to 50 psig (207 to 345 kPa).
Gauges will equalize.
8. Gauges will remain in this position
(approximately 30 to 50 psig [207 to
345 kPa]) if the three-way valve seals
properly toward the condenser and the
condenser pressure bypass check valve seals
properly.
9. Back seat condenser pressure bypass check
valve stem against snap ring. Both gauges
should rise indicating the condenser pressure
bypass check valve is properly releasing
condenser pressure into the discharge tube and
evaporator.
10. Replace the cap on the condenser pressure
bypass check valve.
NOTE: Valve stem MUST be back seated
during normal unit operation.
11. Open the receiver tank return outlet valve,
remove the gauges and return the unit to
normal operation.
1.
Check Valve
2.
Heating/Defrost Position
3.
Cooling Position
Figure 54: Three-way Valve Condenser Pressure
Bypass Check Valve
Содержание 919180
Страница 4: ...4...
Страница 10: ...Table of Contents 10...
Страница 32: ...Unit Description 32 Unit Photographs Figure 3 Front View Figure 4 Back View AJA584 AJA585...
Страница 33: ...Unit Description 33 Figure 5 Left Side View Figure 6 Right Side View AJA586 AJA58...
Страница 35: ...Unit Description 35 Figure 8 North American Power Receptacle Box AJA58...
Страница 38: ...Unit Description 38...
Страница 58: ...Electrical Maintenance 58...
Страница 66: ...Engine Maintenance 66 Figure 37 Fuel and Oil System Components...
Страница 84: ...Engine Maintenance 84...
Страница 96: ...Refrigeration Maintenance 96...
Страница 118: ...Hilliard Clutch Maintenance 118...
Страница 136: ...Cycle Diagrams 136...
Страница 140: ...Wiring and Schematic Diagrams Index 140...
Страница 141: ...141 Truck S Model SR 30 Schematic Diagram Page 1 of 2...
Страница 142: ...142 Truck S Model SR 30 Schematic Diagram Page 2 of 2...
Страница 143: ...143 Truck S Model 30 Units with P T Wiring Diagram Page 1 of 2...
Страница 144: ...144 Truck S Model 30 Units with P T Wiring Diagram Page 2 of 2...
Страница 145: ...145 Truck S Model 50 Schematic Diagram Page 1 of 2...
Страница 146: ...146 Truck S Model 50 Schematic Diagram Page 2 of 2...
Страница 147: ...147 Truck S Model 50 Units with P T Wiring Diagram Page 1 of 2...
Страница 148: ...148 Truck S Model 50 Units with P T Wiring Diagram Page 2 of 2...