3.4.2 Boiler piping connection 

Make  sure  you  connect  the  accessories  and  the 
piping  to  the  proper  connection  fittings  as 
indicated  at  figure  2  above  and  according  to  the 
selected  mounting  position.  The  outlet  and  inlet 
boiler  connections  are  located  on  each  sides. 
They consist of 4 

steel couplings (1”NPTF on 12 to 

24kW  models  and  1-

1/4”NPTF  on  27  to  36kW) 

where the piping connection will be made. 
Local  codes  may  dictate  the  type  of  pipe  to  be 
used for the connections. 
Install isolating valves to facilitate maintenance 

 

3.4.3 Pressure relief valve 

This component is supplied with the unit and must 
be  installed  on  the  boiler.  It  is  designed  to 
automatically  open  at  approximately  30  psi.to  the 
appropriate  connection  according  to  the  mounting 
position.   
Connect the outlet of the relief valve downward to 
a safe location in case of discharge. 
The piping diameter used for the discharge piping 
shall  not  be  smaller  than  that  of  the  valve  outlet. 
No  valve  of  any  type,  restriction  or  reducer 
coupling should be installed on the discharge line.  
Local  codes  shall  govern  the  installation  of  relief 
valves.   

 
3.4.4 Expansion tank 

The  expansion  tank  must  be  able  to  store  the 
increase  volume  of  boiler  water  occurring  when 
the  boiler  water  increase  in  temperature..  The 
maximum  allowable  operating  pressure  is  30  psi 
(207  kPa).  Contact  your  plumbing  supply  house 
for assistance. 
 

3.4.5 Water pressure regulator 

The boiler should be installed in such a way that it 
can automatically be fed with water in the event of 
a pressure drop.  
The minimum pressure obtained when the system 
is cold is generally 12 psi (83 kPa). 
This  accessory  shall  be  equipped  with  one  or 
more  check  valves  to  avoid  all  possibilities  of  the 
boiler  water  returning  to  the  potable  water  supply 
network (local regulation should be applied) 
 

3.4.6 Air eliminator 

Installation  of  manual  or  automatic  air  vents  are 
required to eliminate all air from the boiler and the 
heating distribution system.  
The main air eliminator must be installed near the 
outlet of the boiler on the highest point of the main 
supply  piping.  It  is  imperative  to  insure  that  all  air 

possibly  located  in  the  boiler  be  eliminated  at  all 
time. 

 
3.4.7 Circulating pump 

Water flow is required at all time when the boiler is 
operating. 
The pump shall be selected such as to be able to 
supply  adequate  flow  in  relation  to  the  heating 
distribution  system  on  which  it  will  be  connected 
and the heating capacity of the boiler installed. 
 
Table below shows required flow in relation to the 
power  capacity  of  the  boiler  and  the  required 
temperature  drop  in  the  heating  distribution 
system. On System with baseboard heaters, 20°F 
temperature  drop  is  normally  recommended  and 
on  radiant  floor  application  a  value  of  10°F  is 
generally used. 
 

Table  5:  Temperature  rise  vs  flow  rate 
(GPM) 

Model 

KW 

Diff. Temp. 

Diff. Temp. 

10

o

20

o

BTH ULTRA 12 

12 

8,2 

4,1 

BTH ULTRA 15 

15 

10,2 

5,1 

BTH ULTRA 18 

18 

12,3 

6,1 

BTH ULTRA 20 

20 

13,7 

6,8 

BTH ULTRA 24 

24 

16,4 

8,2 

BTH ULTRA 27 

27 

18,4 

9,2 

BTH ULTRA 29 

29 

20,5 

10,2 

BTH ULTRA 33 

33 

22,5 

11,3 

BTH ULTRA 36 

36 

24,7 

12,3 

 
Your  heating  wholesaler  shall  be  in  good  position 
to  recommend  the  appropriate  model  for  your 
application. 
If the pump is supplied by  the PP terminals of the 
boiler,  its  amperage  plus  the  amperage  drawn  by 
other 120V external components must not exceed 
5A. 
 

3.4.8 Drain valve 

Installed at the lowest part of the unit, it allows the 
boiler  to  be  drained  if  defective  components  need 
to be replaced. 
 

3.4.9 Strainer 

This  component  could  be  required  on  old  heating 
distribution systems made of steel or cast iron that 
could  carry  sediments  and  sludge.  If  such 
sediments accumulate at the bottom of the boiler it 
could  be  harmful  to  the  heat  transfer  of  the 
elements and generate premature failures. 

 

Содержание BTH ULTRA

Страница 1: ...mation and safety measures are provided to enable proper installation operation and maintenance of this product It is imperative that all persons who are expected to install operate or adjust this boiler should read these instructions carefully Any questions regarding the operation maintenance service or warranty of this electric boiler should be directed to the supplier When all installation step...

Страница 2: ... 3 4 5 Water pressure regulator 11 3 4 6 Air eliminator 11 3 4 7 Circulating pump 11 Table 5 Temperature rise vs flow rate GPM 11 3 4 8 Drain valve 11 3 4 9 Strainer 11 3 4 10 Dual Energy piping 12 3 5 ELECTRIC CONNECTIONS 12 3 5 1 Main Electric supply 12 3 5 2 Electrical supply of External accessories 13 3 5 3 Outdoor temperature sensor 13 3 5 4 Connecting the thermostat and pump 13 3 5 4 Dual en...

Страница 3: ...valves 9 Figure 6 Multi pump zoning 9 Figure 7 Typical Installation in Dual Energy Series 10 Figure 8 Typical installation with three way valve 10 Figure 9 Zoning with Multiple pumps 13 Figure 10 Zoning with motorized valves 14 Figure 11 Connexions without three way valve 14 Figure 12 Connexions with three way valve 14 Figure 13 Wiring diagram 12 24 KW 15 Figure 14 Wiring diagram 27 36 KW 15 Figur...

Страница 4: ...5 KW 6 1 x 1 or 2 x 64 1 x 00 or 2 x 44 2 x 80 or 175 33 25 33 119 6 137 5 3 x 5 KW 3 x 6 KW 6 2 x 45 2 x 25 2 x 100 36 27 36 130 5 150 6 x 6 KW 6 2 x 45 2 x 25 2 x 100 1Electrical supply 120 240V or 120 208V 1ph L1 N L2 with three conductors and a ground or a supply with two conductors 240V or 208V 1ph L1 L2 with a ground if the application does not require a 120V electrical supply for external a...

Страница 5: ...63 lbs Item Dimension inches A 21 1 2 B 9 C 11 3 4 D 3 5 8 E 2 3 8 F 14 3 4 G 5 H 9 3 4 I 20 J 1 1 2 Table 3 Boiler connections and dimensions 27 36 KW Connections Inlet return 1 NPT Fem Outlet supply 1 NPT Fem Pressure relief valve 1 reduced to 3 4 NPTFem Drain valve 1 reduced to 3 4NPT Fem Shipping weight 75 lbs Item Dimension inches A 21 1 2 B 11 C 11 3 4 D 3 1 2 E 2 3 4 F 14 1 4 G 7 H 11 5 8 I...

Страница 6: ...uctions and in conformity with local codes or in the absence of local codes with the National Plumbing Code and the National Electric Code current edition In any case where instructions in this manual differ from local or national codes the local or national codes take precedence 2 2 CORROSIVE ENVIRONMENT The electric boiler must not be installed near an air duct supplying corrosive atmosphere or ...

Страница 7: ...ler having a lower setting this controller will be added to the system and connected in series with the factory installed limit control 3 2 LOCATION The electric boiler should be installed in a clean dry location Long hot water lines should be insulated to conserve water and energy The electric boiler and water lines should be protected from exposure to freezing temperature The boiler can be mount...

Страница 8: ...tions shown below Make sure that the fluid flows is in the proper direction Figure 3 Mounting positions 3 4 1 Type of installation You will find below on figures 4 to 8 the typical piping arrangement for the two main types of installation The first being as a self operating unit and the others being connected to an auxiliary boiler in dual energy Figure 4 Typical Installation on heating floor ...

Страница 9: ...BTH ULTRA Electric Boilers Installation Operation manual Revision June 2015 9 Figure 5 Typical installation on fin tube baseboards with zoning valves Figure 6 Multi pump zoning ...

Страница 10: ...BTH ULTRA Electric Boilers Installation Operation manual Revision June 2015 10 Figure 7 Typical Installation in Dual Energy Series Figure 8 Typical installation with three way valve ...

Страница 11: ...e water supply network local regulation should be applied 3 4 6 Air eliminator Installation of manual or automatic air vents are required to eliminate all air from the boiler and the heating distribution system The main air eliminator must be installed near the outlet of the boiler on the highest point of the main supply piping It is imperative to insure that all air possibly located in the boiler...

Страница 12: ...oiler electrical supply is on 208V the position of wire terminal on the transformer connected to 240V will have to be changed to 208V The electrical supply can be done in two different ways depending on the necessity of supplying or not external accessories such as a pump at 120Vac Alternative 1 A 120VAC electrical supply is required to serve external accessories Models 12 to 24 kW Electrical wiri...

Страница 13: ...oiler when the outdoor temperature exceeds the selected value corresponding to the maximum temperature required for heating If you wish to operate the boiler at a fixed target temperature simply do not connect the sensor before applying the power to the unit The sensor shall be connected to terminals S1 S1 in the boiler using two 20 ga conductors Maximum length 100 ft 33 m Do not put a jumper betw...

Страница 14: ...Open the front access panel to the boiler electric compartment Remove the screw at the bottom of the controller raise the upper section of the controller You will see a switch at the back of the controller having two positions ELECT and Bi Energ Position the switch at Bi Energ o Install a 2 wire 18ga cable between the contact N F close contact to allow the operation in electricity Red R wire and g...

Страница 15: ...hement manuel High limit manual reset T T ZDV200 DIABTHU4 Figure 13 Wiring diagram 12 24 KW L1 2 Diagramme électrique Wiring diagram BTH ULTRA 240V 1ph 27 36 kW 208V 1ph 20 27 kW N L1 1 R5 R3 50VA 208 240Vac 24Vac Disjoncteur 33 36kW Breaker 33 36kW only Contrôleur Control ULTRA SMART R6 R4 C2 EL1 R1 C1 white blue red black black red red 208 240V 1ph 12 11 10 9 Com 8 Boil in 7 Boil O 6 Sup D 5 Os ...

Страница 16: ...water of the heating system flows directly from the boiler to the heating distribution system Standard parallel Piping system Two operation modes are then offered Fixed boiler temperature set point the outdoor sensor shall not be installed Or Outdoor reset 4 2 DISPLAYED INFORMATION The electronic control uses an LCD display to make all adjustments and to visualize the operation of the system Figur...

Страница 17: ... of the boiler near the selected target temperature A rotation of the stages based on an equal time period of operation is provided N B The supplied outdoor temperature sensor shall not be connected before applying the electrical power to the unit 4 5 OPERATION WITH OUTDOOR RESET For installation where the boiler target temperature shall modulate in relation to the outdoor temperature when the out...

Страница 18: ...e heat demand has been satisfied This selection shall be selected on systems equipped with motorised fast closing zone valves in order to prevent noise from water hammering 15 sec to 60 min delay where the pump will be kept running to enable the pump to circulate water into the system to equilibrate the heat in all the building ON The pump is in continuous operation Required on particular heating ...

Страница 19: ...parameters will be restored as they were established before the failure Table 5 below shows the presentation sequence of the menus Table 6 CONFIGURATION SEQUENCE OF THE MENU Appuyez 2 secondes sur le bouton ITEM DESCRIPTION RANGE DEFAULT Choose the units the user prefers to work with F or C F Select the type of heating system on which the boiler will be installed Radiant Floor in concrete Radiant ...

Страница 20: ...periods occurring during sunny days Long periods without heating which needs higher boiler temperature to recuperate Return to normal room temperature after thermostat s night set back program Three Boost operating options are available when the is pressed for 6 sec The icon will appear and the three options ON1 ON2 and OFF will be proposed Press the button to select The controller will register t...

Страница 21: ... boiler terminals P1 P2 will be energized at 120volts and the pump will be activated At the same time the contact will close on the AUX terminals to activate the auxiliary boiler This boiler will be activated only when there will be a heat demand to the R W terminals and when the auxiliary boiler temperature will be lower than the settings of its own temperature controls If a three way valve is us...

Страница 22: ...ned earlier and set the purge delay of the pump from On to its normal operation setting The pump should stop 5 2 STARTUP INSPECTION Set the room thermostat ON to generate a heat demand The pump shall start The heating elements shall gradually come on and the boiler temperature will increase N B A rapid activation of all the elements and external components can be done by pressing simultaneously th...

Страница 23: ...s and eliminate air from the radiators 6 4 ANNUALY Make sure that the power on the unit has been turned off before opening the electrical compartments of the boiler It is recommended that a visual inspection be made on the electrical compartments of the boiler to check the water tightness of the gasket on the element flange and also check for any signs of overheating of the components and wires At...

Страница 24: ...mmersion well located at the top of the elect element compartment Check the resistance value ohms of the sensor It should correspond to the value shown on the table below otherwise it should be replaced Stage 2 is ON but not Stage 1 There is no problem A rotation of the stages is provided to allow an equal time of operation of the stages When stage 3 or 4 comes ON stage 1 or 2 comes OFF This seque...

Страница 25: ... to the boiler Boiler safety valve is leaking Pressure reading at the indicator shows a pressure above 28psi Pressure is below 28psi The pressure regulator on the distribution system is defective or the expansion tank is too small or defective Replace the safety valve Table 7 Resistance value of the outdoor sensor vs outdoor temperature Temperature Resistance Temperature Resistance Temperature Res...

Страница 26: ... 208 240V x 24Vac ZEL400 20842440 40VA Fuse ZEL250 TDMIDJ5 UltraSmart Controller ZEL100 ULTRA Temp Pressure indicator ZMC300 75P160CN Figure 18 Spare parts front 12 24 KW Surface High Limit manual reset switch on some Models ZEL200 DISC227 High Limit automatic reset Switch ZEL200 L6C732 Heating elements 3kW ZEL300 240V3KW 4 5kW ZEL300 240V45KW 5kW ZEL300 240V5KW 6kW ZEL300 240V6KW Figure 19 Spare ...

Страница 27: ...roller ZEL100 ULTRA Power relay 24Vac ZEL100 24ACNO30 Pressure relief valve ZMC200 SV30PSI1 4 poles Contactor 24Vac ZEL100 4P50A24 Surface High Limit manual reset switch USA Models only ZEL200 DISC227 High Limit automatic reset Switch ZEL200 L6C732 Heating elements 3kW ZEL300 240V3KW 4 5kW ZEL300 240V45KW 5kW ZEL300 240V5KW 6kW ZEL300 240V6KW Figure 20 Spare parts front 27 29 KW Figure 21 Spare pa...

Страница 28: ...ZMC200 SV30PSI1 Power relay 24Vac ZEL100 24ACNO30 4 poles Contactor 24Vac ZEL100 4P50A24 Temperature and Pressure Indicator ZMC300 75P160CN Transformer 208 240V x 24Vac ZEL400 20842450 50VA Fuse ZEL250 TDMIDJ5 UltraSmart Controller ZEL100 ULTRA Breaker ZEL900 2P100A Figure 22 Spare parts front 33 36 KW ...

Страница 29: ...sure is not installed or if it is not functioning properly or when it is not connected to a drain to avoid damage to the property E Installation in which liquid circulating in the tank does not remain in closed circuit or installation in which piping is leaking or on systems with polybutylene pipes or other having no oxygen absorption barrier F Installation where the acidity of water is not within...

Отзывы: