21
ENGLISH
TECHNICAL ASSISTANCE
LOCATION OF PROBES
SC
SC
T
S
SRS
THERMITAL
THE/COMBI3
combination storage cylinders incorporate probe wells for fitting the solar controller and
boiler probes. Make sure that these probes are inserted all the way.
b
Installers are responsible for all connections to the boiler or hot water generator. Installers must ensure
proper installation and functioning in compliance with all applicable legislation.
T -
Temperature gauge sensor socket (Ø 1/2" M)
SC - Boiler temperature sensor socket (Ø 16 mm)
S
- Temperature sensor socket (Ø 8 mm)
SRS - Solar controller temperature sensor socket
(Ø 16 mm)
It is essential to perform the following checks before
starting up or testing the functioning of the combination
storage cylinder. In particular, check that:
- The supply cocks are all open in the domestic water
circuit.
- The water connections to the boiler and solar heating
system have been made correctly.
- The solar heating circuit has been correctly flushed out
and filled with water-glycol mix, and all air has been
bled out of the circuit.
b
The domestic hot water tank must be filled and
pressurised before the inertial storage cylinder
is filled.
PREPARING FOR INITIAL START-UP
Содержание THE/COMBI3 1000
Страница 1: ...THE COMBI3 INSTALLATION AND MAINTENANCE MANUAL...
Страница 27: ...27 ENGLISH...