46 ThERMEX
GREEN AIR
M 5282110012 17022021
ENG
lIsh
»
INS
TALL
ATION
LAMP HOOD MODEL INSTALLATION
1) Position the hanging plate on the
ceiling and then mark the position of
the screw holes. The hanging plate
should be securely fixed to the ceiling,
○
1
---- 4 x ST6 (40 mm)screws for
wooden ceiling
○
2
-----4 x M6 (60 mm)expansion bolts
for cement ceiling
2) Make the fixing wire & Power cable
pass through to the hole of hanging
plate cover.
4
INSTALLATION