background image

Connect the data cable to steam generator connector.
(The other end of the cable runs to the back of the control 
in the shower location.)

THERMASOL.COM  

I

  800.776.0711

Read warnings on page 2. For illustrative purposes only. Consult with qualified professional for steam room construction details. 

4

Route the data cable (included with 

generator) through the finished wall 

to the back side of the control. 
(The other end of the cable runs to 
the steam generator location.)

NOTE:

 It is recommended to run 

the cable through electrical conduit.

DO NOT

 pinch, nail, staple, wedge, or 

bind the data cable. 

DO NOT

 wrap the data cable around 

steam line or route it in a manner so 
that the hot steam line could melt 
the cable.

Any damage to the control cable 
will result in the control not working 
properly.

Carefully connect the data cable to 
the generator and control BEFORE 
turning power on to the generator.

"ON" 
Turn Clockwise

"OFF" Turn 
Counter Clockwise

• Do not staple, strain or damage data cable
• Align pins to receptacle visually before tightening
• Do not force plug
• Hand tighten only

Connector 
Detail

Back of 
control 
or side of 
generator

Back of Control

Side of generator

Contact pins

Contact pins Contact pin 

receptacle

Back of 
control 
or side of 
generator

MicroTouch Control and Steamhead Installation Instructions

4

 

Control Installation and Data Cable Connection

Содержание MicroTouch Control

Страница 1: ...MicroTouch Control OVER 60 YEARS OF STEAM SHOWER INNOVATION Installation Operation Manual thermasol com solutions ...

Страница 2: ...OR OR FLOORING MANUFACTURER REGARDING THE SAFE USE OF YOUR FLOORING IN A STEAM APPLICATION SLIPPING AND FALLING INTO THE STEAMHEAD ITSELF OR INTO THE STREAM OF STEAM EMITTING FROM THE STEAMHEAD WILL CAUSE SERIOUS BURNS OR PHYSICAL INJURY IF YOU ARE FEELING UNCOMFORTABLE DIZZY FAINT OR STARTING TO FALL ASLEEP IMMEDIATELY EXIT THE STEAM ROOM DO NOT USE STEAM ROOM IF YOU ARE UNDER THE AGE OF 16 UNLES...

Страница 3: ...wall Materials needed o MicroTouch control o CAN bus cable o Silicone o Other materials as required Tools needed o Pipe wrench o Tubing cutter o Wire cutters or wire strippers o Adjustable wrench o Screwdriver Phillips and regular o Solder and flux o 1 1 16 masonry drill bit o 1 1 2 hole saw for surface mount rough in OR 3 hole saw for recessed mount o Drill motor o Other tools as required Control...

Страница 4: ...e data cable DO NOT wrap the data cable around steam line or route it in a manner so that the hot steam line could melt the cable Any damage to the control cable will result in the control not working properly Carefully connect the data cable to the generator and control BEFORE turning power on to the generator ON Turn Clockwise OFF Turn Counter Clockwise Do not staple strain or damage data cable ...

Страница 5: ... fully seal the control to the wall Completely seal the control to the wall so moisture does not collect behind it Place the control on the wall pressing firmly You may need to tape the control into place until the silicone dries Be careful not to harm the wall or control with the tape Let dry for 24 hours before using steam bath A Square Control shown Round Control shown A 3 hole for recessed mou...

Страница 6: ...ng and install to be flush with the finished wall this housing must be sealed to the wall to not allow vapor or water behind it plumbing must be done from backside of finshed space For new framing Mount and install rough in fitting to be flush with finished wall Connect a 1 2 NPT brass pipe or copper tubing to the steam outlet union not included on the generator running the pipe to the steam head ...

Страница 7: ...move the protective cap and insert the steamhead into housing Use the supplied silicone to adherethe steamhead to the wall sealing out any water from getting behind the head Use supplied o ring lubricant to assist in steam head installation A very small amount is all that is need directly on the o rings Upon final installation mount steamhead with facing up to allow aromatherapy well to dispense s...

Страница 8: ...r Changing the Temperature Set Point Set the temperature of your ThermaSol steam shower by using the lit plus or minus symbols which are located immediately to the left and to the right of the power icon An arc array of lit squares will appear from left to right Increase the temperature by touching symbol until desired temperature is displayed by the blue LED lights running clockwise to indicate a...

Страница 9: ...uch Control and Steamhead Installation Instructions Read warnings on page 2 For illustrative purposes only Consult with qualified professional for steam room construction details THERMASOL COM I 800 776 0711 9 ...

Страница 10: ...1958 STEAM WAY ROUND ROCK TX 78665 PHONE 800 776 0711 FAX 800 556 5257 WWW THERMASOL COM 81181 C ...

Отзывы: