Thermal Instrument Co. 600-9 FS Скачать руководство пользователя страница 5

5 | 

P a g e 

 

Effective Date 

7/10/2008 

 

Figure #1

 

 

 

Содержание 600-9 FS

Страница 1: ...AL INSTRUMENT Co 217 Sterner Mill Road Trevose PA 19053 Telephone No 215 355 8400 Fax No 215 355 1789 Email office thermalinstrument com INSTALLATION OPERATION INSTRUCTIONS FOR FLOW SWITCHES 62 9FS 60...

Страница 2: ...ons 250 to 800F service 14 7 to 15 000 PSIG Automatic pressure and temperature compensation Protected precision RTD sensors Explosion proof construction Single alarm levels 2 flow point alarms temp is...

Страница 3: ...ORT MARKED IN AND EXIT AT THE PORT MARKED OUT THE METER SHOULD BE INSTALLED IN A STRAIGHT LINE THIS LINE SHOULD PREFERABLY BE THE SAME DIAMETER AS THE METER TUBE OR PIPE THIS STRAIGHT LINE SHOULD HAVE...

Страница 4: ...TRANSDUCER MUST BE WIHTIN 50 C OF OPERATION TEMPERATURE BEFORE POWER IS APPLIED SENSORS MAY BE DAMAGED IF TRANSDUCER TEMPERATUE IS LOWER THAN THIS LIMIT OR CALIBRATION WILL NOT BE ACCURATE TRIP POINTS...

Страница 5: ...5 P a g e Effective Date 7 10 2008 Figure 1...

Страница 6: ...6 P a g e Effective Date 7 10 2008 Figure 2...

Страница 7: ...7 P a g e Effective Date 7 10 2008 Figure 3...

Страница 8: ...8 P a g e Effective Date 7 10 2008 Figure 4...

Страница 9: ...the metering system The explosion proof type condulets are designed for that purpose only they are not waterproof and if the system is submerged water will enter In applications where there is undue...

Страница 10: ...10 P a g e Effective Date 7 10 2008...

Страница 11: ...11 P a g e Effective Date 7 10 2008...

Страница 12: ...12 P a g e Effective Date 7 10 2008...

Страница 13: ...13 P a g e Effective Date 7 10 2008...

Страница 14: ...14 P a g e Effective Date 7 10 2008...

Страница 15: ...15 P a g e Effective Date 7 10 2008...

Страница 16: ...16 P a g e Effective Date 7 10 2008...

Отзывы: