
6
Ultra-Aire 120V Installation Instructions
www.Ultra-Aire.com | (800) 533-7533
Important Precautions
• The device is designed to be installed indoors in a space that is protected from rain and flooding.
• Install the unit with enough space to access the front panel for maintenance and service.
• Avoid directing the discharge air at people. The dehumidifier should be used in the upright position.
• If used near a water source, be certain there is no chance the unit could fall into the water or get splashed and
that it is plugged into a dedicated circuit and Ground Fault Circuit Interrupter (GFCI) protected outlet.
• DO NOT use the dehumidifier as a bench or table.
• DO NOT place the dehumidifier directly on structural building members without vibration absorbers or unwanted
noise may result. Place the Ultra-Aire 120V on supports to raise the base of the unit.
• A drain pan with a float switch MUST be placed under the dehumidifier if installed above a living area or above
an area where water leakage could cause damage.
Location Considerations
• Allow sufficient clearance to handle the unit’s overall dimensions as well as the necessary return and supply duc-
twork to the unit.
• Allow sufficient clearance for filter removal and to prevent airflow obstruction.
• Electrical service access will require the removal of the front panel. Allow sufficient clearance on this side of the unit.
• Locate the dehumidifier in an area where the cord’s length (9') easily reaches a 115 VAC electrical outlet with a
minimum of a 15 Amp circuit capacity.
• Locate the dehumidifier in an area where field wiring the control (low voltage) to the unit will be possible.
• It is recommended that a backdraft damper be used in the discharge duct of the Ultra-Aire 120V, especially
when connecting to the supply ducting system. The backdraft damper prevents supply air from counter
flowing through the Ultra-Aire 120V when it is not operating. The dehumidifier’s location should be chosen to
allow installation of this accessory if necessary.
• DO NOT hang the
Ultra-Aire 120V
from its cabinet.
• Allow for proper
routing and drainage
of needed drain pipes.
70°F and 60% RH
90 pints/day
6.0 Pints/kWh
Shipping
24”
49”
21”
138 lbs.
3/4" FPT Fitting
6" Fresh Air Intake (Optional)
10" Return Air Duct
8" Supply Air Duct #1
26 3/4"
43 1/2"
Front View
Electrical service
access is through
the front panel
of dehumidifier.
8" Supply Air Duct #2 (Optional)
8" Duct Cover (Optional)
DEHUMIDIFIER SET UP
Содержание 4036400
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ...800 533 7533 www Ultra Aire com...