THE RADIATOR COMPANY Seta Groove Скачать руководство пользователя страница 2

Unpack & Inspect

1

Using a suitable drill bit, screws and plugs, fix the brackets (F) to the 
wall using the supplied backing plates (G), then level with a spirit 
level.

Fix Brackets

4

Contents

2

Bracket Positions

3

Technical Data

The Radiator Company prides itself on selecting products from 
manufacturers who exercise tight quality control measures. We 
only select models with excellent standards of welding and 
brazing, as well as high quality finishes. All of our products are 
well packaged and should reach you in perfect condition. Just in 
case however, we offer a minimum 5-year no quibble guarantee 
for all radiators and towel rails.

 
The Radiator Company must be notified of 
any shortages or damage within 28 days of 
delivery. For further information please see 
terms and conditions on back page.

Accurately mark out bracket holes on wall using spirit level, to 
dimensions shown within the Technical Data section (see left). Once 
brackets positions have been marked out on the wall and checked with 
a spirit level, drill four 10mm holes to a minimum depth of 65mm and 
insert supplied wall plugs.

PLEASE NOTE :

It is essential that all brackets are level to ensure a 
vertical alignment for connecting the pipe work.

Pipe Centres

Pipe centres left to right  =  width plus valves 

Pipe centres from wall 

=  50mm  

Depth from wall 

=  120mm

5

Insert the diverter into the flow-side of the 
collector. Using the supplied key (D), screw 
the diverter (C) in fully.

Identifying the Diverter

Hang Radiator & Commission

6

With the brackets (F) firmly fixed to the wall and the diverter (C) in place, 
undo the grub screws (I) on the brackets (F) with an allen key. Hang the 
radiator onto the brackets ensuring the radiator is fully seated onto all four 
brackets. Adjust brackets if necessary and tighten the grub screws. Before 
commissioning, remember to install the supplied Blanking Plug (B) and 
Airvent into opposite ends of the upper collector.

Please Note: In accordance with Part L1 2006 of the Building Regulations 

and BS7593:1992 code of practice for the treatment of hot water and 

central  heating  systems,  we  strongly  recommend  flushing  the  heating 

system post installation of new radiators and then adding the correct 

quantity and type of inhibitor for use with your radiator and system 

to prevent corrosion. Damage caused to systems not protected by a 

suitable inhibitor will not be covered by manufacturer’s guarantee. 

You should have:
•   1 Radiator

•  1 Air Vent (1/2”)

•  1 Blanking Plug

•  1 Plastic Diverter

•  1 Plastic Diverter Key

•  4 Wall Plugs

•  4 Brackets

•  4 Backing Plates

•  4 Hex Bolts

•  4 Grub Screws

You will need: 
•   Suitable Valves

•  Tape Measure

•  Spanner - 22mm

•  Screwdriver - large flathead

•  Electric drill

•  Masonry drill bit - 10mm 

diameter

•  Spirit level

•  Stepladder (for taller radiators)

PLEASE NOTE :

It is essential that all brackets are level to ensure 
a vertical alignment for connecting the pipework.

Seta Line and Seta Groove are very heavy, 
therefore they should only be hung on solid walls.

Fixing Centres

Seta Groove

Horizontal (H) = Length (mm) minus 135mm

Vertical (V) = Height (mm) minus 70mm

Seta Line

Horizontal (H) =  Length (mm) minus115mm

Vertical (V) = Height (mm) minus 90mm

PLEASE NOTE :
Seta Line and Seta Groove are very heavy, therefore they should 

only be hung on solid walls.

flow

(C)

(D)

V

H

Отзывы: