![THE RADIATOR COMPANY Seta Groove Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/the-radiator-company/seta-groove/seta-groove_fitting-instructions_1100459002.webp)
Unpack & Inspect
1
Using a suitable drill bit, screws and plugs, fix the brackets (F) to the
wall using the supplied backing plates (G), then level with a spirit
level.
Fix Brackets
4
Contents
2
Bracket Positions
3
Technical Data
The Radiator Company prides itself on selecting products from
manufacturers who exercise tight quality control measures. We
only select models with excellent standards of welding and
brazing, as well as high quality finishes. All of our products are
well packaged and should reach you in perfect condition. Just in
case however, we offer a minimum 5-year no quibble guarantee
for all radiators and towel rails.
The Radiator Company must be notified of
any shortages or damage within 28 days of
delivery. For further information please see
terms and conditions on back page.
Accurately mark out bracket holes on wall using spirit level, to
dimensions shown within the Technical Data section (see left). Once
brackets positions have been marked out on the wall and checked with
a spirit level, drill four 10mm holes to a minimum depth of 65mm and
insert supplied wall plugs.
PLEASE NOTE :
It is essential that all brackets are level to ensure a
vertical alignment for connecting the pipe work.
Pipe Centres
Pipe centres left to right = width plus valves
Pipe centres from wall
= 50mm
Depth from wall
= 120mm
5
Insert the diverter into the flow-side of the
collector. Using the supplied key (D), screw
the diverter (C) in fully.
Identifying the Diverter
Hang Radiator & Commission
6
With the brackets (F) firmly fixed to the wall and the diverter (C) in place,
undo the grub screws (I) on the brackets (F) with an allen key. Hang the
radiator onto the brackets ensuring the radiator is fully seated onto all four
brackets. Adjust brackets if necessary and tighten the grub screws. Before
commissioning, remember to install the supplied Blanking Plug (B) and
Airvent into opposite ends of the upper collector.
Please Note: In accordance with Part L1 2006 of the Building Regulations
and BS7593:1992 code of practice for the treatment of hot water and
central heating systems, we strongly recommend flushing the heating
system post installation of new radiators and then adding the correct
quantity and type of inhibitor for use with your radiator and system
to prevent corrosion. Damage caused to systems not protected by a
suitable inhibitor will not be covered by manufacturer’s guarantee.
You should have:
• 1 Radiator
• 1 Air Vent (1/2”)
• 1 Blanking Plug
• 1 Plastic Diverter
• 1 Plastic Diverter Key
• 4 Wall Plugs
• 4 Brackets
• 4 Backing Plates
• 4 Hex Bolts
• 4 Grub Screws
You will need:
• Suitable Valves
• Tape Measure
• Spanner - 22mm
• Screwdriver - large flathead
• Electric drill
• Masonry drill bit - 10mm
diameter
• Spirit level
• Stepladder (for taller radiators)
PLEASE NOTE :
It is essential that all brackets are level to ensure
a vertical alignment for connecting the pipework.
Seta Line and Seta Groove are very heavy,
therefore they should only be hung on solid walls.
Fixing Centres
Seta Groove
Horizontal (H) = Length (mm) minus 135mm
Vertical (V) = Height (mm) minus 70mm
Seta Line
Horizontal (H) = Length (mm) minus115mm
Vertical (V) = Height (mm) minus 90mm
PLEASE NOTE :
Seta Line and Seta Groove are very heavy, therefore they should
only be hung on solid walls.
flow
(C)
(D)
V
H