background image

Diagrams of BDO 25

102 - 116

63 - 77

72

72

17.5

Bracket Sleeve

Bracket Stud

Bracket Assembly

Unpack & Inspect

You should have:
•   1 Radiator
•  4 Wall brackets sleeves
•  4 Wall brackets studs
•  1 Blanking Plug  
•  Air vent 

Using a suitable drill bit, screws and plugs, loosely fix the top two 
brackets sleeves onto the wall where marked using the dimensions in 
section 3, (refer to diagrams opposite) and level with a spirit level.  
 
Offer up the radiator to the sleeves to ensure they are in the correct 
position. If the radiator is in the correct position, hold the radiator 
and mark the position for the bottom brackets.  
 
Remove the radiator and fix the two bottom sleeves onto the wall. 
Offer up the radiator again and slot the radiator into the bracket 
sleeves.  
 
Once the radiator is in the correct position, firmly fix the radiator by 
tightening the grub screws on the side of the brackets. 

Fix Brackets and Hang Radiator 

5

Contents

2

Mark Bracket Positions

4

The Radiator Company prides itself on selecting products from 
manufacturers who exercise tight quality control measures. We 
only select models with excellent standards of welding and 
brazing, as well as high quality finishes. 
 
 All of our products are well packaged and should reach you 
in perfect condition. Just in case however, we offer a minimum 
5-year no quibble guarantee for all radiators and towel rails.

 
The Radiator Company must be notified of 
any shortages or damage within 28 days of 
delivery. For further information please see 
terms and conditions on back page.

Firstly attach the bracket studs to the back of the radiator (shown in 
diagram)  
 
The fixing positions for the two top brackets are measured at 72mm 
down from the top of the collector and measured 17.5mm in from the 
side (brackets are positioned on the collector, please see diagram 
opposite).

In order to accurately mark the bottom bracket fixing positions we 
recommend you mark, fix and level the two top brackets first. Then 
hang the radiator, ensuring it is vertically level and manually hold the 
bottom brackets in position while marking. 

PLEASE NOTE :

It is essential that all brackets are level to 
ensure a vertical alignment for connecting the 
pipe work.

Pipe Centres

Pipe centres left to right

Pipe centres from wall

Depth from wall

Commission

6

Please Note: 

In accordance with Part L1 2006 of the Building Regulations and 

BS7593:1992 code of practice for the treatment of hot water 

and central heating systems, we strongly recommend flushing 

the heating system post installation of new radiators and then 

adding the correct quantity and type of inhibitor for use with 

your radiator and system to prevent corrosion. Damage caused 

to systems not protected by a suitable inhibitor will not be 

covered by manufacturer’s guarantee. 

width - 35mm

63mm - 77mm 

102mm - 116mm

1

2

You will need:
•  Tape measure
•  Electric drill and bits
•  Spirit level

Removing Diverter

23

Before installation of your BDO 25 the diverter needs to be removed. 
 
To check the position of the diverter, remove the end caps and 
look down the collector. You should not be able to see any light if a 
diverter is present.  
 
If a diverter is present, using a long screwdriver knock out the 
diverter, then securely close the end caps before installation.  

Отзывы: