STEP 4 – THE UPPER DRUM
F-
Position the upper drum onto the bottom drum over the rim, making sure the mounting holes
align in both as well as the labeled arrows.
Screw a M8x16 hex bolt with lock and flat washers into each threaded hole in the rim/ring gear.
Make sure the tightening process is carried out progressively.
Secure the mixing blades to the upper drum by inserting two M8x20 cross headed screws, from the
outside through the holes in the drum.
A rubber washer should be positioned inside between the drum and blade. Secure the mixing blade
on the inside using a flat washer, spring washer and nut.
Finally, ensure top and bottom mixing blade mountings are tight.
STEP 5 – THE TIPPING WHEEL
G
- Slide the locking plate over the large diameter shaft at the leg end of the frame with the rim
facing inwards as shown. Secure with two M8x25 bolts, each with a nut, lock and flat washers.
H
- Insert the spring with the washer on the top into the sleeve on the tipping wheel. Slide the wheel
over the larger diameter shaft until the holes in the bracket line up with the hole drilled. Insert a
M10X65 hex bolt with a flat washer and screw on a nut with a flat washer from the other side. Screw
the nut up against the bracket firmly, but not so tightly so as to prevent the wheel from pivoting
about the bolt. Screw a M10x40 socket head cap screw on the sleeve to adjust the spring tension
NOTE -
The wheel must be allowed to pivot about the bolt, so that the lugs on the bracket can be
engaged or disengaged from the slots in the locking plate.
Содержание 193821002
Страница 2: ......
Страница 10: ...COMPONENTS ...
Страница 17: ...PARTS DIAGRAM ...
Страница 18: ......
Страница 24: ......