The Greenhouse People 4 Tier Скачать руководство пользователя страница 2

 

If you would like a          

brochure containing our 
extensive product range 

then please contact us at,  

 
‘The Greenhouse People’,  
Unit 9B Blythe Park,  
Cresswell Lane,  
Cresswell,  
Stoke—On—Trent.   
Staffs.   
ST11 9RD.   

 

• 

Move

 the frame into situ. 

• 

Insert 

trays. 

If you have any queries  

please do not hesitate  

to call us on 

01782 388811

www.thegreenhousepeople.co.uk 

 

• 

Stand the frame on a level floor so the frame is square when the nuts are tightened.   

 

• 

Tighten-up 

each nut and bolt ensuring that both the long and short horizontals butt up against the leg.   

 

This creates a tight fit for each tray in the frame.  Make the horizontals 

flush

 at the top for a 

neat smooth 

finish.   

 

• 

Check that the frame is 

square

, diagonal measurements should be 

equal

.  Adjust If necessary. 

 

• 

Push the 

'black caps' 

onto each nut. 

Flush at top. 

 

Push  

on  

black  
caps.  

Butt up tight  

Отзывы: