6. Screw the top of horizontal stud directly to the Firebox brackets (use 0.5 inch metal zips)
7. Continue building the wall
8. Support the firebox with screws around the flange into the stud
9. Cover the firebox with sheetrock, wonderboard, stones, tile, etc.
10. Mount the glass into firebox
Страница 1: ...24 FIREBOX SS Installation Instructions...
Страница 2: ...round the firebox The Firebox cavity must be a lined with a minimum of 3 8 thick cement board A 609 6mm 24 B 133 4mm 5 25 C 165mm 6 1 Line the base with cement board and insert your Firebox into the b...
Страница 3: ...is a layer of cement board between the stud and your Firebox on all sides 4 First stud on either side of the Firebox must be flush with the Firebox and flange 5 Install a stud horizontally on top of...
Страница 4: ...ly to the Firebox brackets use 0 5 inch metal zips 7 Continue building the wall 8 Support the firebox with screws around the flange into the stud 9 Cover the firebox with sheetrock wonderboard stones...
Страница 5: ......
Страница 6: ...bio ethanol Never use another liquid or gel to refill The Bio Flame As a consequence the warranty will expire as well Installation of floor level The Bio Flame Fireplaces Make sure Bio Flame is kept...
Страница 7: ...he paint on the insert Fill no more than 2 3 of the way to prevent overflow When The Bio Flame is filled remove the funnel The Bio Flame is ready to be used Important If you do not burn the Methylated...