background image

157 Jaffa Street, "Amot Building" Haifa Israel ,35251 Fax + (972) 4 6228513 . Tel + (972) 4 8216942

 

c. * Place each of the SCCs in a place exposed to sun light, up to the maximum height

from the sensor as per sensors’ cables length. Best energy results are obtained when unit
is pointed to area where maximal exposure to sunlight travel is obtained, (e.g. to the
south at northern hemisphere countries). The devices should be placed vertically so that
rain, snow or dirt will not build up on the solar panels. Use zip ties or iron wire to attach
the SCCs to the desired place (e.g. plant, pole, etc.)

d. Connect the cable of a 433MHz (magnetic base) antenna to each of SCCs’ (golden)

connectors

e. * For best radio communication performance, it is recommended to place the 433MHz

antennas highest as possible – to get minimal obstruction, by leaves, walls, etc.  The
antenna has a magnet base that will make installation on a metal surface very easy.
While attaching the antenna base to a metallic surface is perfectly OK, please note that
metal elements that are located 

between

 the SCC antenna and the gateway might

seriously affect the radio communication or even totally block it. For best
communication it is desired to have a direct line-of-sight path free of metal obstacle
between antenna and gateway. Both the gateway’s and SCC’s antennas should be
installed in same, vertical orientation.

f.

The SCC’s energy storage are pre-charged hence start working automatically, and
transmit their respective sensor’s data every 30 minutes

3. Install the wireless gateway and plug it to the AC power:

Below is a drawing of the wireless gateway front panel. Note that in some models the “RF2” 
connector is not populated.  

a. Connect the cable of the 433MHz (magnet base) antenna to “RF” connector
b. * For best radio communication performance, it is recommended to place the 433MHz

antennas highest as possible – to get minimal obstruction, by leaves, walls, etc.  The
antenna has a magnet base that will make installation on a metal surface very easy.
While attaching the antenna base to a metallic surface is perfectly OK, please note that
metal elements that are located 

between

 the SCC antenna and the gateway might

seriously affect the radio communication or even totally block it. For best
communication it is desired to have a direct line-of-sight path free of metal obstacle
between antenna and gateway. Both the gateway’s and SCC’s antennas should be
installed in same, vertical orientation.

c. Connect the cellular antenna to “Cellular” connector
d. Connect the AC power adaptor to the 4-pin “Molex” connector on the left of the

Wireless Gateway Panel, as shown below:

Содержание Sol Chip Comm Wireless Solar Tag System Kit

Страница 1: ...157 Jaffa Street Amot Building Haifa Israel 35251 Fax 972 4 6228513 Tel 972 4 8216942...

Страница 2: ...itors the following parameters soil moisture air temperature and air humidity and sends these parameters to the internet Cloud This real time actionable sensors data is an enabler of IOT applications...

Страница 3: ...is controlled via the cable which connects to one of the SCCs Plugged into the ground Sensor cable Connector 3 Air Temperature and Humidity Sensor 1 The dual purpose sensor is controlled through the c...

Страница 4: ...ernal energy storage is depleted Plugged into the SCC sensor connector AC Adaptor 9 Magnet 1 This accessory can be used to manually activate sampling of data from the sensor and transmission to the ga...

Страница 5: ...a Street Amot Building Haifa Israel 35251 Fax 972 4 6228513 Tel 972 4 8216942 Item no Item name Qty Description Picture 14 Soil Moisture sensor data sheet 1 15 Air Temperature and humidity sensor data...

Страница 6: ...SCCs are all weather IP 67 compliant hence can be placed outdoor e g in an agricultural field and operate in temperatures from 20C to 80C exposed to rain etc 3 The SCC solar panels need few hours of...

Страница 7: ...a Connect the soil moisture sensor cable to the SCC 1 s sensor connector black Similarly connect the air temperature and humidity sensor cable to the second SCC 2 2 Place the sensors in the desired l...

Страница 8: ...of sight path free of metal obstacle between antenna and gateway Both the gateway s and SCC s antennas should be installed in same vertical orientation f The SCC s energy storage are pre charged hence...

Страница 9: ...lar A Red LED ON The Gateway is connected to the server OFF The Gateway is not connected to the server Cellular B Green LED Blinks quickly 2 times per second or ON search for cellular network Blinks s...

Страница 10: ...il with an invitation to activate your account Look for the following email From Telit IoT Portal noreply devicewise com Subject line Welcome to the Sol Chip Portal powered by deviceWISE If you cannot...

Страница 11: ...972 4 6228513 Tel 972 4 8216942 c Your account is now activated proceed to login d After login please review and agree to the general terms and conditions and privacy policy of the portal e After app...

Страница 12: ...go to https solchip devicewise net and enter your login information If you forgot your password use the Recover account Reset password link to reset your password If you are still having trouble cont...

Страница 13: ...d and is accessible for viewing by the user We are constantly updating our services always check the latest version of the user guide on our website at https solchip devicewise net Navigating sensor d...

Страница 14: ...972 4 6228513 Tel 972 4 8216942 Sensor visualization service Below is an example of a Temperature sensor graph The user can set the time window to view historical data and horizontal zoom shorter time...

Страница 15: ...gateway location to a place with proper coverage 2 Note that if you observe a cellular signal in your mobile device it may be that the SIM in the gateway is configured to roam to a different network...

Страница 16: ...n few seconds Attention Please familiarize yourself with the important safety related notes below 1 Carefully unpack the Demo kit When unpacking care should be taken to prevent dropping 2 One should b...

Страница 17: ...0 26 30 F 45 88 20 26 39 E nordic texim europe com Zuiderlaan 14 bus 10 B 1731 Zellik T 32 0 2 462 01 00 F 32 0 2 462 01 25 E belgium texim europe com Martin Kollar Strasse 9 D 81829 M nchen T 49 0 89...

Отзывы: