8
3.
Inspect the bottom of the cooking chamber for any grease build up and clean
as needed. See page 16 for more details.
4.
Install the heat management plate. See
FIG 2
.
5.
Install cooking grates and optional second shelf See
FIG 1
.
6.
Clean grease bucket as needed. See
FIG 3
.
FIG 3