![Texas Instruments TPS543620 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/texas-instruments/tps543620/tps543620_user-manual_1096986010.webp)
Table 3-2. Test Points
REFERENCE
DESIGNATOR
NAME
RELATED IC
FUNCTION
TP1
VIN_U1
U1
VIN test point. Use this for efficiency measurements.
TP2
VOUT_U1
U1
VOUT test point. Use this for efficiency, output regulation, and bode plot measurements.
TP3
SW_U1
U1
SW node solder mask opening
TP4
PGND_U1
U1
PGND test point
TP5
PGND_EFF_U1
U1
PGND test point. Use this for efficiency measurements.
TP6
PGOOD_U1
U1
PGOOD test point
TP7
EN_U1
U1
EN test point. If applying an external voltage, it must be kept below the absolute maximum
voltage of the EN pin of 6 V.
TP8
AGND_U1
U1
AGND test point
TP9
BODE_U1
U1
Test point between voltage divider network and output voltage. Used for Bode plot
measurements.
TP10
VOUT_U1
U1
SMB connector to measure output voltage. When using this test point, the scope should
be set for 1-MΩ termination. When using 50-Ω termination, a 2:1 divider is created.
TP11
VIN
Both
VIN test point near input terminals
TP12
VIN_U2
U2
VIN test point. Use this for efficiency measurements.
TP13
SW_U2
U2
SW node solder mask opening
TP14
SW_U2
U2
SW node test point
TP15
VOUT_U2
U2
VOUT test point. Use this for efficiency, output regulation, and bode plot measurements.
TP16
PGND_U2
U2
PGND test point
TP17
PGND_EFF_U2
U2
PGND test point. Use this for efficiency measurements.
TP18
PGOOD_U2
U2
PGOOD test point
TP19
PGND
Both
PGND test point near input terminals
TP20
AGND_U2
U2
AGND test point
TP21
BP5_U2
U2
BP5 test point
TP22
BODE_U2
U2
Test point between voltage divider network and output voltage. Used for Bode plot
measurements.
TP23
EN_U2
U2
EN test point. If you are applying an external voltage, it must be kept below the absolute
maximum voltage of the EN pin of 6 V.
TP24
VO_ADJ
U2
Test point for injecting current into the FB divider to adjust the DC output voltage or inject a
step to FB to test OVP
TP25
VO_2NDSTG
U2
Test point to measure output voltage after second stage filter if added to EVM.
TP26
SYNC
Both
SYNC test point. Supply an external clock to this test point to synchronize both regulators
to it.
TP27
FSEL
U2
FSEL test point
TP28
SW_U2
U2
SMB connector to measure SW node. When using this test point, the scope should be
set for 50-Ω termination. The combination of 50-Ω termination and 450-Ω series resistance
creates a 10:1 attenuation.
TP29
VOUT_U2
U2
SMB connector to measure output voltage. When using this test point, the scope should
be set for 1-MΩ termination. When using 50-Ω termination, a 2:1 divider is created.
TP30
VO_2NDSTG
U2
SMB connector to measure output voltage after second stage filter if added to EVM. When
using this test point, the scope should be set for 1-MΩ termination. When using 50-Ω
termination, a 2:1 divider is created.
TP31
FGEN
Both
Test point to connect function generator to load transient circuit. Slowly increase amplitude
and vary slew rate of function generator for desired load step.
TP32
ISNS
Both
Test point to measure current in load transient circuit. Gain is 20 A/V.
TP33
PGND
Both
PGND test point for load transient circuit
TP34
MODE
U2
MODE test point
Test Setup and Results
10
TPS543620 SWIFT™ Step-Down Converter Evaluation Module User's Guide
SLVUBQ1A – AUGUST 2020 – REVISED MAY 2021
Copyright © 2021 Texas Instruments Incorporated