2-1
Setup and Equipment Required
Setup and Equipment Required
This chapter examines the setup and use of the evaluation module and the re-
sults of operation.
Topic
Page
2.1
Overview
2-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2
Applying an Input
2-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3
Observing an Output
2-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.4
Typical Test Results
2-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 2
Содержание SLLU040A
Страница 8: ...Contents viii ...
Страница 12: ...1 4 ...
Страница 19: ...Typical Test Results 2 7 Setup and Equipment Required Figure 2 5 Typical Output From SN65LVDS100 EVM ...
Страница 20: ...2 8 ...
Страница 26: ...Board Layer Patterns 3 6 Layer 3 VCC Split Plane INT2 Layer 4 GND Plane Bottom Side ...