Copyright © 2017, Texas Instruments Incorporated
Test Summary
5
SLUUBK9 – September 2017
Copyright © 2017, Texas Instruments Incorporated
bq25600, bq25600D PWR771 Evaluation Module
9.
Install shunts as shown in
, or as shown in
.
Figure 2. Original Test Setup for bq25600xEVM
9. Turn on the computer and launch the Battery Management Studio (bqStudio).
10. Select
Charger
and bq25600 (or bq25600D, accordingly) evaluation software.
shows the
main window of the software.
Figure 3. Selection Window of bqStudio Evaluation Software