Texas Instruments BMS034 Скачать руководство пользователя страница 4

1.2 I/O Descriptions

Table 1-2

 table lists the BQ2579XEVM board connections and ports.

Table 1-2. EVM Connections

Connector, Port

Description

J1

VIN1

Positive rail of the priority input adapter or power supply

GND

Ground

J2

VIN2

Positive rail of the secondary input adapter or power supply

GND

Ground

J3

SYSTEM

Positive rail of the charger system output voltage, typically connected to the system load

GND

Ground

J4

VPMID

Positive rail of the charger output voltage for reverse mode (OTG). This output also shares the rail with 
VBUS in forward mode

GND

Ground

J5

BATTERY

Positive rail of the charger battery input

SNS_BATP

Input connected to the positive terminal of the battery for remote battery voltage measurement

GND

Ground

J6

USB port

USB Micro B port used for input source type detection and handshaking. Connected to either VIN1 or 
VIN2

J7

EXTERNAL 
THERMISTOR

Input connected to an external battery temperature sensing thermistor

GND

Ground

J8

Communication port

I

2

C communication port for use with the EV2300/2400 Interface Board

J9

Communication port

I

2

C communication port for use with the USB2ANY Interface Adapter (for future use)

Table 1-3

 lists the shunt installations available on the EVM, and their respective descriptions.

Table 1-3. EVM Shunt and Switch Installation

Shunt

Description

BQ25792/6/8 Setting

JP1

ACDRV1 pin connection to control ACFET1-RBFET1. Connect this to _acdrv1 net (labeled 
VAC1 FET) when utilizing the input protection MOSFETs. Connect this to GND when input 
protection MOSFETs are not used or bypassed

ACDRV1 to VAC1 FETs (short 
pins 1 to 2)

JP2

ACDRV2 pin connection to control ACFET2-RBFET2. Connect this to _acdrv2 net (labeled 
VAC2 FET) when utilizing the input protection MOSFETs. Connect this to GND when input 
protection MOSFETs are not used or bypassed

ACDRV2 to VAC2 FETs (short 
pins 1 to 2)

JP3

VIN1/VAC1 to VBUS bypass connection. Connect this when the input protection MOSFET 
feature is not desired. This connects the input source on VIN1 to VBUS.

Not Installed

JP4

VIN2/VAC2 to VBUS bypass connection. Connect this when the input protection MOSFET 
feature is not desired. This connects the input source on VIN2 to VBUS.

Not Installed

JP5

BAT to BATTERY bypass connection. Connect this when the ship and shutdown mode 
features are not desired and JP8 pins 1 and 2 are shorted.

Not Installed

JP6

USB Micro B input D– connection to charger D- pin. Connect this when the input source 
detection and handshake features are desired.

Installed

JP7

USB port J6 positive rail to charger VBUS selection. Use shunt to select either VIN1/VAC1 or 
VIN2/VAC2 as the connection for the USB port.

USB_VIN to VAC1

JP8

SDRV pin connection to control SFET. Short pins 1 to 2 of JP8 and install shunt across JP5 
when ship and shutdown mode features are not desired. Short pins 2 to 3 of JP8 and remove 
shunt from JP5 when ship and shutdown mode features are desired.

Short pins 2 to 3

JP9

BATP pin connection. BATP is always connected to J5 pin 2 for remote battery sense. If 
off-board remote sense is not used, short pin 2 to J5 pin 1 (BATTERY) for the charger constant 
voltage sensing to occur at the J5 connector after the Q5 ship mode FET Short pin 2 to pin 3 
(BAT pin) for the charger constant voltage sensing to occur on the PCB board close to the IC 
before Q5 ship mode FET. Do not leave BATP pin floating.

Short pin 2 to J5 pin 1 
(BATTERY)

JP10

Charger D+ and D- pin short connection. Connect this to simulate a DCP type adapter for the 
input source detection and handshake feature. Remove in order to use the charger's D+/D- 
detection feature.

Installed

Introduction

www.ti.com

4

BQ25792EVM, BQ25798EVM and BQ25798BKUPEVM (BMS034) Evaluation 
Module

SLUUCB5E – JUNE 2020 – REVISED JULY 2022

Submit Document Feedback

Copyright © 2022 Texas Instruments Incorporated

Содержание BMS034

Страница 1: ...high temperatures may be present Table of Contents 1 Introduction 3 1 1 EVM Features 3 1 2 I O Descriptions 4 1 3 Recommended Operating Conditions 6 2 Test Setup and Results 6 2 1 Equipment 6 2 2 Equ...

Страница 2: ...25798BKUPEVM BMS034A B 005 and BQ25798EVM BMS034A B 003 Schematic Page 2 20 Figure 4 7 BQ25798BKUPEVM BMS034A B 002 Schematic Page 1 21 List of Tables Table 1 1 Device Data Sheet 3 Table 1 2 EVM Conne...

Страница 3: ...VM is a complete module for evaluating the BQ25792 8 charger IC in the QFN package Key features of this EVM include Synchronous Switch Mode Buck Boost Charger for 1s 4s Battery Configuration for 5 A C...

Страница 4: ...or bypassed ACDRV2 to VAC2 FETs short pins 1 to 2 JP3 VIN1 VAC1 to VBUS bypass connection Connect this when the input protection MOSFET feature is not desired This connects the input source on VIN1 to...

Страница 5: ...ct to configure charger default setting to 1S charge regulation voltage 2 A charging current and 750 kHz switching frequency Not Installed JP24 PROG pin setting for 2S 1 5 MHz Connect to configure cha...

Страница 6: ...a 1000 F or higher low ESR 25 V rated or higher connected at the EVM battery and ground terminals is recommended Alternative Option A 0 20 V 0 5 A 60 W DC electronic load set in a constant voltage loa...

Страница 7: ...re the system voltage as seen from the SYS pins of the charger 9 Install shunts as shown in Table 1 3 Power Supply 1 Load 1 Battery Simulator V V V V V V EV2300 2400 USB V V V V V 4 pin Connector VPMI...

Страница 8: ...o the TI Charger GUI landing page From the landing page locate the device desired for evaluation and click Select Device Note that the EVM must be powered and the USB2ANY must be connected to both the...

Страница 9: ...ttery Management Studio use the following steps for communications verification 1 In Battery Management Studio select READ REGISTER at the top of the page Device ACK OK should appear at the top of the...

Страница 10: ...iption of what the icons on the left side panel mean Figure 2 5 Icon Guide Note If the EVM is powered but not communicating for example does not ACK try updating the USB2ANY firmware to the latest ver...

Страница 11: ...BUS Present bit 0 and Power Good bit 3 2 Reinstall the shunt on jumper J17 to enable charge Verify STAT LED D13 is lit 3 Take measurements as follows noting that you may have to adjust the output of t...

Страница 12: ...using the PROG pin Jumpers JP24 to JP31 The battery configuration can also be changed using 16 bit register tab Charger Multi bit Registers REG0Ab 7 6 Note that the SYSMIN and charge current charge wi...

Страница 13: ...5 Turn on Load 2 output set to CR of 24 6 Take measurements as follows Measure VAC1 PGND TP22 and TP45 12 0 V 0 2 V Measure IAC1 SENSE TP1 and TP2 500 mA 0 10 A 7 Lower the Load 2 CR to 10 8 Take mea...

Страница 14: ...r terminal if required 5 Place bulk capacitors for VBUS and BAT pins as close as possible to their respective pins Use at least 2 vias per capacitor terminal if required 6 Place the inductor close to...

Страница 15: ...ow the board layout for the BQ2579XEVMs Figure 4 1 BMS034A B Top Layer www ti com Board Layout Schematic and Bill of Materials SLUUCB5E JUNE 2020 REVISED JULY 2022 Submit Document Feedback BQ25792EVM...

Страница 16: ...1 Board Layout Schematic and Bill of Materials www ti com 16 BQ25792EVM BQ25798EVM and BQ25798BKUPEVM BMS034 Evaluation Module SLUUCB5E JUNE 2020 REVISED JULY 2022 Submit Document Feedback Copyright 2...

Страница 17: ...2 www ti com Board Layout Schematic and Bill of Materials SLUUCB5E JUNE 2020 REVISED JULY 2022 Submit Document Feedback BQ25792EVM BQ25798EVM and BQ25798BKUPEVM BMS034 Evaluation Module 17 Copyright 2...

Страница 18: ...Board Layout Schematic and Bill of Materials www ti com 18 BQ25792EVM BQ25798EVM and BQ25798BKUPEVM BMS034 Evaluation Module SLUUCB5E JUNE 2020 REVISED JULY 2022 Submit Document Feedback Copyright 20...

Страница 19: ...Figure 4 5 BQ25792EVM BMS034A B 001 and BQ25798EVM BMS034A B 003 Schematic Page 1 www ti com Board Layout Schematic and Bill of Materials SLUUCB5E JUNE 2020 REVISED JULY 2022 Submit Document Feedback...

Страница 20: ...2 JP29 1 2 JP28 1 2 JP27 1 2 JP26 3S 3S 4S 4S 1 5MHz 1 5MHz 750kHz 750kHz 1A ICHG 1A ICHG 1A ICHG 1A ICHG AGND 1 2 JP31 1 2 JP33 Green 1 2 D13 1 2 JP32 STAT LED CONNECT STAT 10 0k R39 10 0k R40 10 0k...

Страница 21: ...atic Page 1 www ti com Board Layout Schematic and Bill of Materials SLUUCB5E JUNE 2020 REVISED JULY 2022 Submit Document Feedback BQ25792EVM BQ25798EVM and BQ25798BKUPEVM BMS034 Evaluation Module 21 C...

Страница 22: ...20 2DS On Shore Technology J5 1 Terminal Block 5 08 mm 3x1 Brass TH 3x1 5 08 mm Terminal Block ED120 3DS On Shore Technology J6 1 Connector Receptacle Micro USB Type B R A Bottom Mount SMT 7 5x2 45x5m...

Страница 23: ...0K5FKEA Vishay Dale R32 1 14 0k RES 14 0 k 1 0 1 W AEC Q200 Grade 0 0603 0603 CRCW060314K0FKEA Vishay Dale R33 1 18 0k RES 18 0 k 1 0 1 W AEC Q200 Grade 0 0603 0603 ERJ 3EKF1802V Panasonic R34 1 27 0k...

Страница 24: ...D5 D10 0 40V Diode Schottky 40 V 0 38 A SOD 523 SOD 523 ZLLS350TA Diodes Inc D3 D4 D7 D8 0 30V Diode Schottky 30 V 1 A SOD 123 SOD 123 MBR130T1G Diodes Inc D9 0 12V Diode Zener 12 V 300 mW SOD 523 SO...

Страница 25: ...reference to BQ25798BKUPEVM and part number 22 Changes from Revision A September 2020 to Revision B December 2020 Page Added BQ25796 and BQ25798 features and data sheet literature numbers 3 Updated d...

Страница 26: ...ther than TI b the nonconformity resulted from User s design specifications or instructions for such EVMs or improper system design or c User has not paid on time Testing and other quality control tec...

Страница 27: ...These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not in...

Страница 28: ...instructions set forth by Radio Law of Japan which includes but is not limited to the instructions below with respect to EVMs which for the avoidance of doubt are stated strictly for convenience and s...

Страница 29: ...any interfaces electronic and or mechanical between the EVM and any human body are designed with suitable isolation and means to safely limit accessible leakage currents to minimize the risk of electr...

Страница 30: ...R DAMAGES ARE CLAIMED THE EXISTENCE OF MORE THAN ONE CLAIM SHALL NOT ENLARGE OR EXTEND THIS LIMIT 9 Return Policy Except as otherwise provided TI does not offer any refunds returns or exchanges Furthe...

Страница 31: ...change without notice TI grants you permission to use these resources only for development of an application that uses the TI products described in the resource Other reproduction and display of thes...

Отзывы: