TESY HPWH 2.1 200 U02 Скачать руководство пользователя страница 32

 

 

 

 
 

Page 

32

 of 

35

 

21 

Disinfection period 

 

1~30 days 

7 days 

Adjustable 

22 

EXV open step during defrosting 

 

10 ~ 47 

30 

Adjustable 

23 

EXV delay time 

 

3 ~ 30 

21; N*10 sec. 

Adjustable 

24 

Low pressure switch detects temp 

 

-10~25 

-5 

Adjustable 

25 

Delay detects time of low-pressure switch 

after compressor start 

 

2min

20min 

5min 

 

26 

Temp to change 4-way change working way 

 

-10

10

 

-2

 

27 

The time to power on 4-way valve after 

compressor starts 

 

0-15min 

2min 

 

28 

Electrical expansive valve action after 

compressor off 

 

0-1 

0=Invalid/1=Valid 

29 

Heat pump setting temperature 

 

0-1 

0: TS1=real value 

1: TS1=manual 

30 

Compensation temperature 

 

-10 ~ 10

 

0

 

Adjustable 

31 

Ambient temp sampling period 

 

2-120min 

15min 

Adjustable 

32 

E-heater control after reach setting temp 

 

0-1 

Adjustable 

33 

Temp difference to start e-heater 

 

1-10

 

3

 

Adjustable 

34 

Max setting temp for e-heater 

 

65-85

 

75

 

Adjustable 

35 

ON/OFF 

 

0-1 

0: (remote on/off signal) 

1: (PV function) 

 

Checking parameters: Check the real temperature and expansion valve working process.

 

 

Short press button 

 to entry temp and EXV open step checking. 

Lower tank water temp. 

T2 

-

9 ~ 99°C 

Actual testing value. Error code P1 will be 

shown in case of a malfunction 

 b 

Upper tank water temp. 

T3 

-

9 ~ 99°C 

Actual testing value. Error code P2 will be 

shown in case of a malfunction 

Evaporator coil temp. 

T4 

-

9 ~ 99°C 

Actual testing value. Error code P3 will be 

shown in case of a malfunction 

Return gas temp. 

T5 

-

9 ~ 99°C 

Actual testing value. Error code P4 will be 

shown in case of a malfunction 

Ambient temp. 

T1 

-

9 ~ 99°C 

Actual testing value. Error code P5 will be 

shown in case of a malfunction 

Temp of solar thermal collector 

 

~0 ~ 140

 

Measured value

 

if failure

 

show P6 

 

Electronic expansion valve step 

 

10 ~ 47 step 

N*10 step 

Tank water setting temp. real value 

TS1 

 

 

 
 

Содержание HPWH 2.1 200 U02

Страница 1: ...Page 1 of 35 SERVICE MANUAL v1 24 09 2019 HPWH 2 1 200 U02 HPWH 2 1 200 U02 S HPWH 2 1 260 U02 HPWH 2 1 260 U02 S...

Страница 2: ...and control 6 D Access to the heat pump 8 E Electric wiring diagram and heat pump refrigerant scheme 9 F Actions to be taken when error code appears on display 11 G Intervention procedure 13 H Full l...

Страница 3: ...ize it re enters the evaporator and the cycle starts all over again The operating principle of the equipment is as follows Fig 1 I II The coolant fluid sucked in by the compressor flows inside the eva...

Страница 4: ...nlet line hot gas 18 Replaceable magnesium anode 19 Hot water outlet connection G 1 20 Recirculation fitting G 21 Evaporator s distributor 22 Condensates drain G 3 4 23 Solar coil G 1 1 2 m2 surface 2...

Страница 5: ...Page 5 of 35...

Страница 6: ...duct from the mains power supply at least for one minute and connect it again properly 2 Verify the presence of power supply voltage 3 Switch on the product 4 Wait for the established time for the wat...

Страница 7: ...ut there are warnings on the display The product supplies hot water and the display signals irregular conditions Refer to the section F 6 Irregular operation but display does not indicate any anomaly...

Страница 8: ...TO THE HEAT PUMP OPENING OF THE EXTERNAL CASE 1 Unwind the screws No40 M6x60 DIN564 2 Pull the upper panel No32 in upper direction 3 Pull the Front 34 and Back 33 panels in upper direction 3cm and th...

Страница 9: ...Page 9 of 35 E ELECTRIC WIRING DIAGRAM AND HEAT PUMP REFRIGERANT SCHEME...

Страница 10: ...Page 10 of 35...

Страница 11: ...3 PCB board failure 1 Check the sensor connection 2 Replace the sensor 3 change the PCB board 1 Procedure 5 3 Procedure 1 Ambient temp sensor failure P5 5 flashes 1 dark 1 The sensor open circuit 2 Th...

Страница 12: ...5 Procedure 11 6 Procedure 1 Over heat protection HTP Switch E3 8 flashes 1 dark 1 Too high tank water temp 2 The switch damaged 3 PCB board failure 1 If the tank water temp is over 85C the switch wi...

Страница 13: ...supply 1 Switch off the HPWH 2 Disconnect the unit from main electricity supply 3 Unscrew four screws No 1 2 3 4 4 Open the front cover 5 Disconnect all cables and wirings of the PCB 6 Gently dismantl...

Страница 14: ...temperature sensor T2 designated by Number 2 on a yellow ring 5 Pull the cable out 6 Replace with a new one on reverse order 7 When pushing a new sensor into the thermo pocket tube see Fig pr 2 1 ass...

Страница 15: ...ables are in contact with moving parts or sharp edges Fig pr 3 1 Procedure 4 4 CHECK AND CHANGE OF EVAPORATOR COIL TEMPERATURE SENSOR NTC thermosensor code G0030153 NTC thermosensor model 5K L1200T To...

Страница 16: ...disconnect the cable of return gas temperature sensor T5 designated by Number 5 on a yellow ring 5 Pull the cable out 6 Replace with a new one on reverse order 7 When mounting a new sensor into the h...

Страница 17: ...f return gas temperature sensor T1 designated by Number 1 on a yellow ring 5 Pull the cable out 6 Replace with a new one on reverse order 7 When mounting a new sensor into the holder see Fig pr 6 1 as...

Страница 18: ...protective gloves and eyeglasses 1 Switch off the HPWH 2 Disconnect the HPWH from the main electric supply 3 Open the PCB box as per procedure 1 4 Tear up the cable bundle containing the cable of ERV...

Страница 19: ...o the probe and to the recovery machine By the same way connect recovery machine to the empty bottle for R134a Fig pr 9 6 5 Open the tap 1 2 and all others Then start the recovery machine in dischargi...

Страница 20: ...to its user manual 20 The quantity of refrigerant that should be charged in heat pump is 880 890g The gas located into the hoses and recovery machine does not count 21 Stop the recovery machine Close...

Страница 21: ...ses 1 Switch off the HPWH 2 Disconnect the HPWH from the main electric supply 3 Open the PCB box as per procedure 1 4 Tear up the cable bundle containing the cable of pressure switches 5 On terminal C...

Страница 22: ...FAN REPLACEMENT 1 Switch off the HPWH 2 Open the PCB box as per procedure 1 3 Tear up the cable bundle containing the cable of the Fan 4 On PCB terminal OUT4 Fig pr 11 1 disconnect the cable of Fan D...

Страница 23: ...Page 23 of 35 Fig pr 11 6 Fig pr 11 7 Fig pr 11 7 Screws No2 11 pieces Screws No3 4 pieces Screws No3 4 pieces Screws No3 4 pieces Screws No3 4 pieces...

Страница 24: ...the thermopocket of electric heating element Fig pr 12 3 7 Replace with a new one on reverse order 8 When mounting a new thermo switch into the thermopocket Fig pr 12 3 assure that the thermoswitch is...

Страница 25: ...procedure 1 4 Tear up the cable bundle containing the cable of pressure switches 5 On terminal OUT3 Fig pr 13 3 disconnect the cable of 4 way valve 6 With multimeter measure the resistance of the coi...

Страница 26: ...r 14 1 5 If the heating element is still not working than check its resistance If the value is 0 Fig pr 14 3 proceed with the replacement of the heating element The value of the normally working heati...

Страница 27: ...f the value is 0 proceed with the replacement of compressor itself Fig pr 15 2 7 If capacitor is OK procced with a compressor replacement Fig pr 15 3 8 Discharge the refrigerant as per procedure 9 9 R...

Страница 28: ...Page 28 of 35 Fig pr 15 3 Fig pr 15 5 Fig pr 15 4 Fig pr 15 6 Ground connection...

Страница 29: ...Disconnect the unit from main electricity supply 3 On the back side of the front panel unscrew four screws No 1 and remove the plastic cover 4 Plastic body of control display is fixed to the metal pl...

Страница 30: ...electric supply 1 Switch off the HPWH 2 Disconnect the unit from main electricity supply 3 Open the front cover of PCB box as per procedure 1 4 Disconnect all cables and wirings of the Transformer co...

Страница 31: ...osting cycle period t4 1 12 min 8 min Adjustable 10 M Electronic expansion valve adjustment 0 1 1 Adjustable 0 manual 1 auto 11 M Target over heat degree 9 9 C 5 C Adjustable 12 M Steps of manually ad...

Страница 32: ...start e heater 1 10 3 Adjustable 34 M Max setting temp for e heater 65 85 75 Adjustable 35 I ON OFF 0 1 0 0 remote on off signal 1 PV function Checking parameters Check the real temperature and expan...

Страница 33: ...0 50 0 55 0 Evaaporating pressure Bars Water tank temperature oC Working diagram Inlet air temperature 7oC 2 50 2 70 2 90 3 10 3 30 3 50 3 70 3 90 4 10 4 30 4 50 10 0 15 0 20 0 25 0 30 0 35 0 40 0 45...

Страница 34: ...Brazing consummative 2 4 6 8 10 12 14 16 18 20 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 gas pressure Bars gas temperature oC Gas pressure of R134a acc to its temperature 1 50 1 60 1 70 1 80 1...

Страница 35: ...ng Discharging refrigerant Recovery machine Scales High pressure hoses for refrigerant Refrigerant bottles full empty Special measuring instruments Multifunctioning tool for heat pump and air conditio...

Отзывы: