10.1 SAFETY PRECAUTIONS DURING MAINTENANCE WORK:
▪
Shut down the wind turbine system (section 8.2).
10.2 INSPECTION AND MAINTENANCE SCHEDULE:
Interval
Component
Activity
Daily
Wind turbine Check for abnormal noises
Rotor blades Check that the blades turn freely
Tower
Inspect for damage
Yearly twice / at
end of winter or
after extreme
weather events
Rotor blade
Inspect for cracks / damage and if necessary, replace
Treat with underbody protection wax
Are the rotor blades balanced?
Mounting
Base
Check for vibration
Check the guy wires
Is the Base mounted properly?
Inspect for damage
Wind turbine Check the bolts
Electrical
wiring
Inspect the cables for damage
INSPECTION SCHEDULE TABLE
▪
Refer to the supplementary documents for information on maintaining supplier
components.
10.
MAINTENANCE
WARNING: Risk of injury when carrying out maintenance work! X Shut
down the wind turbine system prior to all maintenance work. X Take steps
to prevent the wind turbine system from being switched on again by
unauthorised persons.
WARNING:
Shut down the wind turbine system immediately if the rotor blades or
the electrical wiring are damaged.
Содержание ZEUS3.0
Страница 2: ...ZEUS 3 0 MADE IN EUROPE 2 TESUP A GLIMPSE OF ZEUS 3 0 ...
Страница 12: ...ZEUS 3 0 MADE IN EUROPE 12 TESUP 4 1 1 POWER CURVE POWER CURVE ...
Страница 13: ...ZEUS 3 0 MADE IN EUROPE 13 TESUP 4 2 GENERAL ARRANGEMENT DRAWING 31 5 cm 193 0 cm 108 cm ...
Страница 21: ...ZEUS 3 0 MADE IN EUROPE 21 TESUP ASSEMBLY PROCEDURE ...
Страница 30: ...ZEUS 3 0 MADE IN EUROPE 30 TESUP 13 DECLARATION ...
Страница 33: ...ZEUS 3 0 MADE IN EUROPE 33 TESUP 16 NOTES ...