21
7.
PR
E
-
U
S
E
P
REP
AR
A
TI
O
N
SCAN TO WATCH INSTALLATION VIDEO
•
Place the tail pipe into its slot and tighten it by screwing it correctly.
•
Place the tail plate into its slot behind the tail pipe and tighten it by screwing
it correctly.
•
If you are using a charge control unit, you must install a battery
-
inverter in
your charge control unit before proceeding!
•
Connect the 3
-
phase AC output terminals located at the wind turbine output
to the charge control unit with battery
-
inverter input and make sure to
screw the terminals tightly.
•
If you are using your charge control unit in 'Battery' mode, you should adjust
the maximum voltage with the help of the potentiometer on it. (The maxi-
mum voltage setting is made to protect the system and to activate the auto-
matic braking system when the wind speed reaches the capacity to produce
the voltage value we have determined.)
MAGNUM 5 (MADE IN EUROPE)
Make sure the 3
-
phase AC cable at the wind turbine output is not short
-
circuited.
If there is a short circuit, the turbine will brake itself and the blades will be pre-
vented from turning.
Содержание MAGNUM 5
Страница 2: ...2 PRODUCT OVERVIEW MAGNUM 5 MADE IN EUROPE MAGNUM 5 ...
Страница 11: ...11 4 1 1 POWER CURVE 4 PARAMETER DIMENSIONS POWER CURVE MAGNUM 5 MADE IN EUROPE ...
Страница 12: ...12 4 2 GENERAL ARRANGEMENT 4 PARAMETER DIMENSIONS NOTE DIMENSIONS ARE IN mm ft MAGNUM 5 MADE IN EUROPE ...
Страница 14: ...14 5 2 WIRING DIAGRAM 5 CONTROLLER WIRING DIAGRAM MAGNUM 5 MADE IN EUROPE ...
Страница 30: ...30 12 DECLARATION MAGNUM 5 MADE IN EUROPE DECLARATIONS ...
Страница 32: ...32 14 NOTES NOTES ...
Страница 33: ...33 HEADQUARTERS TESUP HEADQUATERS 22 SUTTON LANE NORTH CHISWICK LONDON W4 4LD UNITED KINGDOM ...