
Laboratory mortar mixer
1.0205
29
9.8 Setting the soft start
In order to prevent the mix from splashing out, it is possible to set a gentle
start.
1.
The setting is made in the service menu
2.
Press
F2
, using the up
or down symbols
, select the appropriate
setting function for soft start.
3.
Activate the setting function by pressing
F3
(flashing background indi-
cates activity) and select the desired start-up time with
F2
or
F1
.
Soft start can be set between 0-5 seconds.
4.
Press
F3
and take over the selection.
(Background permanently black)
5.
Press
F4
twice to switch to the work menu.
6.
After pressing
F4,
the work menu is displayed.
9.9 Selection of standardized or variable speed (optional)
Note
This selection is only supported if it has been ordered.
Under certain operating conditions, the possibility of setting variable speeds is
desirable. In a separate display menu, the speed of the paddle can be changed
continuously using the up
or down
symbols. A speed indicator on the display
shows the rotation of the gear head (low speed) and that of the paddle (high
speed). The maximum speed that can be set is limited at 153/350 rpm = 60 Hz
and the minimum speed at 36/82 rpm = 15 Hz. This corresponds to the technical
possibilities of the geared motor used.
Содержание 1.0205
Страница 48: ...Laboratory mortar mixer 1 0205 48 22 I O board...
Страница 49: ...Laboratory mortar mixer 1 0205 49 23 Circuit diagram...
Страница 51: ...Laboratory mortar mixer 1 0205 51 24 2 Mixing program 2 according to EN 480 T1...
Страница 52: ...Laboratory mortar mixer 1 0205 52 24 3 Mixing program 3 according to EN 196 T3...
Страница 53: ...Laboratory mortar mixer 1 0205 53 24 4 Mixing program 4 according to EN 196 T9...
Страница 55: ...Laboratory mortar mixer 1 0205 55 25 2 Mixing program 2 according to ASTM C451...
Страница 56: ...Laboratory mortar mixer 1 0205 56 25 3 Mixing program 3 according to ASTM C305 paste with start delay...
Страница 57: ...Laboratory mortar mixer 1 0205 57 25 4 Mixing program 4 according to ASTM C305 paste without start delay...