13
WARNING :
-
CHECK BOTH OF THE BATTERY GROUPS FOR CORRECT POLARITY AND VOLTAGE
-
DO NOT TURN ON THE BATTERY SWITCH (F5) BEFORE STARTING THE UPS
5. Connect the copper earth bus, to the safety earth of the mains distribution panel.
NOTE :
The earth and the neutral connections must be in accordance with the local rules.
WARNING: Note that the Input Neutral (N1) MUST also be connected to K10 terminal
2.6.1 Description of connection terminals of the UPS :
Figure 2.2
a
40 - 60 kVA Cable Connection
Figure 2.2
b
80 kVA Cable Connection
Содержание DS300HB Series
Страница 1: ...DS300HB SERIES DSP Controlled UPS pf 1 0 40 60 80 kVA 3 Phase In 3 Phase Out USER MANUAL ...
Страница 2: ......
Страница 17: ...15 30x12V Batteries 30x12V Batteries 0 360V 360V 0 K1 K2 K3 K2 Figure 2 3 External Battery Connections 60x12V ...
Страница 18: ...16 Figure 2 3a DS300HB Series 40 60 80 KVA Internal Battery Connections 2x30 60x12V 7Ah ...
Страница 62: ...60 ...
Страница 68: ......
Страница 69: ...AGKK13241 10 2021 ...