Teryair 6VMD Series Скачать руководство пользователя страница 6

FF-MM-370-REV - 01

Page 6

Operation and Maintenance Guide  6 VM Air Motor Series

   Daily Before Operating

1.  Disconnect air line and muffler. 
2.  Add flushing solvent directly into motor. If 

using liquid solvent pour in 1 to 2 ounces of  

recommended oil into the motor.

3.  Rotate the shaft by hand in both directions for 

a few minutes.

4.  You must wear eye protection for this step.  

Cover exhaust with a cloth and reconnect the 

air line. 

5.  DO NOT use  kerosene or ANY other   

combustible solvents to flush this product.

6.  Restart the motor at a low pressure of    

approximately 10 PSI/0.7 bar until there is no 

trace of solvent in the exhaust air.

7.  Listen for changes in the sound of the motor. 

If motor sounds smooth, you are finished. 

If motor does not sound like it running  

smoothly, installing a service kit will be  

required.

Air Supply

The air should be clean and dry. Supply                   

air pressure maximum 7kg/cm²(100 psi) for 

Lubricated and maximum 5.6 kg/cm²(80 psi) for 

Lube-free.

Hoses

•  Daily before operation check the hoses,   

especially the high pressure hoses for damage 

or leaks

•  Use genuine Teryair spares and if possible 

mention the serial number of the Vane motor 

when ordering spares.

   Operating  instructions

Vane motors are rugged dependable product  

designed to give you years of satisfactory    

service. Follow the instructions mentioned here 

to enhance life and performance. Check the  

direction of the motor airflow. A single rotation 

motor will operate properly only in one    

direction.Single rotation motors require a   

muffler to be connected to the air port. Remove 

the plastic shipping plugs from the ports. Save 

plugs for future use during shutdown.

        Mounting

This product can be installed in any orientation. 

Mount the motor to a solid metal base plate that is 

mounted to a stable, rigid operating surface. Use 

shock mounts to reduce noise and vibration. Install 

a pressure regulator or simple shut-off valve to 

control motor.

       Storage

•  It is your responsibility to follow proper  

 

shutdown procedures before storage.

•  Turn off air intake supply.
•  Disconnect air supply and vent all air lines.
•  Remove Vane motor from connecting   

machinery.

•  Remove the muffler.
•  Wear eye protection. Keep away from air stream. 

Use clean, dry air to remove condensation from 

the inlet port of the motor.

•  Lubricate motor with a small amount of oil into 

the intake port. Rotate shaft by hand several times 

to distribute oil.

•  Plug or cap each port.
•  Coat output shaft with oil or grease.
•  Store motor in a dry environment.

Lubrication Requirements

Lubricated Vane motor: Always install a line 

lubricator on the air line as close to the Vane motor 

as possible. A Filter Regulator Lubricator unit (FRL) 

is strongly recommended. Keep the lubricator bowl 

topped up with recommended grade of oil and check 

that the oil is reaching the Vane motor Running the 

Lubricated Vane motor without lubrication is likely to 

cause damage to the components causing  premature 

replacement.

Содержание 6VMD Series

Страница 1: ...VMNXXX NEMA Model with Lube Lube Free SG Iron SS NPT BSPT Variants 6VMDXXX IEC Model with Lube Lube Free SG Iron SS NPT BSPT Variants 6 V M Read this manual carefully before installing operating or se...

Страница 2: ...tructions 6 Operating instructions 7 Suggested Lubricants 7 Troubleshooting 8 Dis assembly and Re assembly 9 Exploded View for 6VM Air Motor 10 Bill of Materials for 6VM Series SG Iron 11 Bill of Mate...

Страница 3: ...12 Nm 105 lbs in Air Consumption 0 to 240 m3 hr 0 to 140 cfm Motor Weight 7 5 kgs 16 5 lbs Operating Pressure 1 4 to 7kg cm2 20 to 100PSI Max Allowable speed 3500 rpm ATEX limit 500 2500 2000 1000 15...

Страница 4: ...or on the casting opposite the pipe ports The maximum surface temperature listed on the motor is for nor mal environmental and installation conditions Fort air motors Temp Class T6 Gas and T85 C Dust...

Страница 5: ...inches 1 2 meter from the air motor Install the lubricator level with or above the air motor so that the oil mist will blow direct ly into or fall down into the motor Install a ilter in the air line b...

Страница 6: ...e Check the direction of the motor airflow A single rotation motor will operate properly only in one direction Single rotation motors require a muffler to be connected to the air port Remove the plast...

Страница 7: ...or serviced Air source inadequate Inspect and repair Air source too far from motor Reconfigure setup Suggested Lubricants Brand Above 27 Deg C From 5 Deg C to 27 Deg C Below 5 Deg C Shell Toona R 72 T...

Страница 8: ...e To remove the Front Bearing Cap 6 from Front Flange 2 unscrew CSK Bolt 21 from it The O ring 9 and Oil Seal 10 can be now removed from Front Bearing Cap 6 Replace with new ones if found damaged f N...

Страница 9: ...REV 01 Page 9 Operation and Maintenance Guide 6 VM Air Motor Series Exploded View for 6VM Air Motor 1 13 17 4 3 7 9 5 19 11 14 18 24 23 16 20 15 12 2 6 9 10 21 FOOT FACE 25 7 18 14 22 10 8 2 IEC NEMA...

Страница 10: ...1 1 1 1 1 1 1 6 FRONT BEARING CAP 805 21 11 1 1 1 1 7 BALL BEARING 2Z ZZ 805 50 02 2 2 2 2 1 1 1 1 8 BALL BEARING 2Z ZZ 805 50 01 1 1 1 1 9 O RING 805 40 01 2 2 2 2 1 1 1 1 10 OIL SEAL 805 60 01 1 1...

Страница 11: ...03 1 1 5 REAR BEARING CAP 805 27 04 1 1 1 1 1 1 1 1 6 FRONT BEARING CAP 805 27 05 1 1 1 1 7 BALL BEARING 2Z ZZ 805 50 02 2 2 2 2 1 1 1 1 8 BALL BEARING 2Z ZZ 805 50 01 1 1 1 1 9 O RING 805 40 01V 2 2...

Страница 12: ...FF MM 370 REV 01 Page 12 Operation and Maintenance Guide 6 VM Air Motor Series Foot Mounting 6VM FACE Mounting 6VM Dimensional Data...

Страница 13: ...FF MM 370 REV 01 Page 13 Operation and Maintenance Guide 6 VM Air Motor Series NEMA Flange Mounting 6VM IEC Flange Mounting 6VM...

Страница 14: ...CRIPTION S NO We Hereby Certify That The Above Referenced Product Has Tested And Inspected In Accordance With Our Standard Test Pro cedures And Meets The Specifications For Material And Performance Va...

Страница 15: ...EN ISO 80079 36 2016 Explosive atmospheres Part 36 Non electrical equipment for explosive atmospheres Basic method and requirements EN ISO 80079 37 2016 Explosive atmospheres Part 37 Non electrical e...

Страница 16: ...after deposit with the transporter for shipment iii a Product is not properly preserved packaged stored processed or handled after receipt iv a Product is not used and maintained in accordance with T...

Страница 17: ...FF MM 370 REV 01 Page 17 Operation and Maintenance Guide 6 VM Air Motor Series This page is intentionally Left blank...

Отзывы: