Terrco 3100-3P Скачать руководство пользователя страница 6

Operating Instructions  

Introduction 

This Manual has been prepared to assist and 
instruct you in the proper operation and     
maintenance of you machine.  Please bear in 
mind that your Terrco

® 

3100 is a precision 

piece of machinery manufactured to exacting 
standards.  In order for you to obtain maximum 
use of your Terrco

® 

3100, we suggest that you 

read this manual completely and thoughly 
before attempting to operate your machine.  A 
parts diagram adm parts refenence sheet are 
included to assist you in ordering the proper 
parts.  Always give the machine number and 
model number when ordering repair parts.

                     

  

PLELIMINARY PROCEDURES TO FOLLOW   
BEFORE PUTTING THE 3100 IN OPERATION 
FOR THE FIRST TIME. 

A.  Delivery of the Machine 
     1.  On delivery, the contractor should very 
carefully examine the shipping crate to see that 
no part of the machine is damaged.  If damage 
is noted, request an inspection immediately and 
request a copy of the claim report.  When     
accepting the machine from the delivering    
carrier, note the damage on the Freight Bill   
before signing.  TERRCO

®

 WILL NOT honor 

any claims for broken, damaged, or missing 
parts that may have occurred in shipment, as 
each machine is checked and inspected for the 
same, before leaving our plant. 

B.  Installation and Replacement of Grinding 
Stones 
     1.  Move the counterbalancing weights to the 
upper weight baskets.   
     2.  Using the flop handle, tilt machine back 
so that the caster wheel rests on the floor. 
     3.  Clean mounting surface both on plug 
stone and stone holder.  On 2” or 3” diameter 
plug stone, push stone in the hole and give the 
stone a slight twist to be certain it is securely in 
place. 
     4.  Grasp machine handle and lower machine 
to the floor slowly so that all stones are resting 
on the floor.  Make certain no stones have fall-
en or loosened while lowering the machine to 
the floor. 

C.  Transport of Machine 
     1.  With counterbalancing weights in the  
upper weight baskets, tilt the machine so that 
the caster wheel is firmly on the floor.  You can 
use the flop handle to pull the machine or you 
can fold the flop handle over and push from 
gear case side. 

D.  To operate the 3100 
     1.  Disconnect electrical source. 
     2.  Install stones per instructions in #1B. 
     3.  After stones are installed, lower the     
machine until it is in operating position.    
CAUTION - Never attempt to start the machine 
while lowering machine to the floor, as rear 
stones will strike on corners resulting in thrown 
stones and possible damage to the machine. 
     4.  Before plugging into the electrical      
system, check the voltage at the source.  The 
minimum acceptable voltage is (210/420 Volt, 
60 HZ, 3 phase), or (380 Volt, 50 HZ, 3 Phase).  
Anything lower than this can result in blown 
heaters and possible motor burnout. 
     5.  If the machine is to operate in an area 
more than 100 feet from the source, it will be 
necessary to use the next larger size cable (#4-
4) from the source to the 100 feet of #6-4 wire 
cable that was furnished with the machine. 
     6.  After you have the cable in place, relieve 
pressure on the stones by applying your weight 
on the handle and push the start button on the 
starter switch, then releasing pressure on the 
handle to lower the machine to the floor. 
     7.  We recommend that the first pass over 
the floor be made with the weights in the upper 
weight baskets.  After the floor is “roughed” 
out, move the weights to the weight baskets  
located on the gear case for maximum abrasive 
pressure. 
     8.  Be sure to periodically check stone wear, 
to prevent grinding with the steel plugs, rather 
than the stones. 

Содержание 3100-3P

Страница 1: ...0 Series OPERATING INSTRUCTIONS ILLUSTRATED PARTS LIST MAINTENANCE INSTRUCTIONS Terrco Inc 222 1st Avenue NW Watertown SD 57201 Phone 605 882 3888 Fax 605 882 0778 Email info terrco com 3100 LP Motor...

Страница 2: ...of 1 200 sq ft per day PRODUCTION RATES Motor 25 HP 3 Phase 60 Hz 220 440 Volt Abrasive Pressure on Discs Weights up 800 lbs Weights down 1090 lbs Speed of Discs 60 Hz 2480 S F P M each disc 50 Hz 206...

Страница 3: ...ons WARNING Rotating grinding wheels can cause injury keep hands and loose clothing clear WARNING Disconnect power at the machine before servicing or changing grinding stones WARNING Always check grou...

Страница 4: ......

Страница 5: ...t employees must wear proper footwear E Always wear appropriate safety protection such as eyewear hearing and if needed respiratory protection F When grinding watch for problems on the floor such as b...

Страница 6: ...andle and lower machine to the floor slowly so that all stones are resting on the floor Make certain no stones have fall en or loosened while lowering the machine to the floor C Transport of Machine 1...

Страница 7: ...om starter to the battery 8 Pull throttle knob a quarter to half way out 9 Pull out ignition switch to on position and press rubber start button to start 10 Allow engine to warm up approximately 10 mi...

Страница 8: ...t on engine drive sheave 5 Tighten adjusting screw until required belt tension in obtained Belt should compress no more than 1 16 with full thumb pressure midway between engine pulley and idler pulley...

Страница 9: ......

Страница 10: ...ew 16 69 SM186 Spacer 1 23 HB25 Washer 16 70 2082 Set Screw 1 24 FE125B Drive Gear electric 2 71 FE78 Water Tank Rod 1 FE6 Drive Gear LP 2 72 SM174 Water Valve 1 25 FE4B Driven Gear RH 2 73 FE189 Valv...

Страница 11: ...MODEL 3100 HANDLE BAR...

Страница 12: ...474 UPPER BELT GUARD 1 11 FE 475 LOWER BELT GUARD 1 12 FE 294 V BELT 1 13 FE 293 PULLEY 1 14 X 81 STRAIGHT CORD CONNECTOR 3 15 FE 292 2 HP MOTOR 1 16 FE 291 PULL PIN 2 17 FE 285 KEYLESS LOCKING HUB 2...

Страница 13: ...l Liquid Propane Engine Configuration 4 Cylinder In Line SOHC Block Material Cast Iron Head Material Cast Aluminum Bore x Stroke in 2 5 8 x 2 7 8 Total Piston Displacement 999 cc Compression Ratio 9 7...

Страница 14: ...MODEL 3100 LP ENGINE 1 ZENITH ENGINE 2 OIL FILTER 3 AIR FILTER 4 OIL DRAIN HOSE 5 MUFFLER 6 LP GAS FILTER...

Страница 15: ...52 SHEAVE 1 20 FD77 PULLEY SPACER 1 21 FD115 BEARING 2 22 FD122 FELT WASHER 1 23 FD131 ENGINE SHEAVE 1 24 FD78 BEARING SPACER 1 25 FE66C PINION RH 1 26 T1008 KEY 1 27 T2111 MOUNTING RING BOLTS 4 28 FE...

Страница 16: ...e list of authorized motor repair stations sent with the machine and locate the station nearest you B Contact the repair station giving them the following information 1 Complete nameplate date from th...

Страница 17: ...purchaser F O B Watertown South Dakota THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRATNIES EXPRESSED OR IMPLIED INCLUDING THE WARRANTIES OR MERCHANTABILITLY AND FITNESS FOR USE AND ALL OTHER OB...

Отзывы: