REVISED DATE: 5/5/2016
KENNEL CLUB PLAYGROUND INSTALLATION GUIDELINE
Page 10
Kennel Club Playground
Installation Guideline
Proceed to place the Dog Barrier panels in the locations as shown below. The bottoms of the
barriers should be placed 1-1/2” to 2” above the surface of the deck platform. The outside
edges of the panels (C) should align flush with the outside of the 4x4 posts. Once in place
fasten (4) 5/16” x 2-1/2” RSS Screws (2 per side) through the barrier panel and into the post.
5/16” x 2-1/2” RSS Screw
Kennel Club Assembly (Contd.)
C